Sand and mud dredging
Valparaiso Port, Chile (2010)
Project Description: Sand and mud dredging
Challenges
- PE pipes lasted only one cycle
- Failure due to abrasion
Solution
300 m of PEXGOL™ pipe 225 mm, class 15