Deep borehole & corrosive water
Project Description: Installation of 350 meters of PEXGOL™ pipe 160(24) for a borehole in a location where the water is extremely corrosive
Challenges: Lifetime of steel pipe in use was 6 months; increase the lifetime of the system to 10 years
Solution
PEXGOL™ pipe was delivered in one single piece with only two connections. Installation time was one day vs. a week and a half for steel pipe.