Industrial waste on rough terrain
Dead Sea Works, Israel (1996)
Project Description: Transporting industrial waste, 26 km over rough terrain including a height differential of 800 meters, causing the pipe to work partly as a siphon, partly as a high pressure pipe and partly as a channel.
Challenges
- Rough terrain
- Flexibility
- Corrosion
- Need for 100% safe system
Solution
PEXGOL™ pipe 280 and 315, class 12, over a distance of 26 km; supplied to site in lengths between 80–120 m
PEXGOL pipes in use with no failures since 1996, and with a 35% cost savings