Lodine pipe line
Processing Plant, Chile (2008)
Project Description: Iodine transport; scaling formation inside HDPE pipes
Challenges: Prevent scaling formation (salt deposition); precipitation of calcium sulfate on the HDPE inner wall
Solution
Single 1.5 d elbow PEXGOL™ 225(15) + straight PEXGOL 225(15) spool connected by vitaulic joints, together with a 160(15) PEXGOL spool 1.5 m long.