Pex Tubing Projects
 
Refinery Pex Tubing System  
 
 
 
Thermo Mineral Pex Tubing  
Food Pallet Tubing  
Mine Pex Tubing  
Salt Slurries Tubing  
Tubing System for Industrial Waste  
Sewerage Pex Tubing Systems  
Salt Water Pex Tubing  
Applications  
   
 
 Boreholes Tubing system - pex tubing    
 

Project Highlights:

Pipe system for BOREHOLES

 

Israel since 1987

Argentina 2003

Spain 2003

Project challenges:

High costs. Metal pipes corrode.

Installation is slow and awkward. Installation time 3-4days

WELLMASTER pipe is more expensive than Pex and can be installed only once.

The Solution:

Pexgol pipes of class 15, 24 and 30 have been used in deep boreholes for 15 years.

Installation time 3-4 hours.

Deepest installation of pipe class 30 is 270 meters.

315 mm in one unit at a length of 70 meters without fittings. Quick installation.

Pump may be withdrawn, and replaced easily.

Annual saving -15,000 $ per borehole.

 

       
Previous Project   Next Project
                       
Golan Plastic Products Kibbutz Shaar Hagolan, 15145 Israel Tel: 972-4-6677432 Fax: 972-4-6677451 E-mail: golan@golan-plastic.com
© Copyright GOLAN Plastic Products. 2004 Subject legal terms as specified. All rights reserved. Designed by: Studio e-tsuv
HebrewSpanish Catalogs