Skip to content

Fluorosilicic Acid Transport

Pexgol Pipe for the Transport of Fluorosilicic Acid.

Case Study Nº

70

Customer

Phosphate Mine – ICL Rotem
Israel

|

1995

Working Conditions

Pressure: 5 bar / Temperature: 60°C

Pexgol Pipes

Pexgol 250 mm, Class 10 | Pexgol 280 mm, Class 10 | Pexgol 315 mm, Class 10

Application

Acid transport

Lenght

Systems made up of hundreds of meters with elbows, tees and branches.

Categories

Pexgol Pipe for the Transport of Fluorosilicic Acid.

The Challenge

From the beginning ICL Rotem used HDPE, 316 stainless steel and rubberized steel pipes for the transport of fluorosilicic acid. Beyond the costly installation, the tubes suffered from corrosion and wear, forcing maintenance workers to replace the tubes every 5 to 9 months, and on several occasions to stop production altogether.

Pexgol Solution

  • • In the first instance, PE-X test tubes were placed in the fluid to be transported. Once the laboratories certified that the acid did not carry out any chemical attack on the tubes, 12 meter pipe sections were installed with electrofusion couplings.
  • Since then, in 1995 till today thousands of meters have been installed transporting fluorosilicic acid without having to replace the tubes or have to carry out any maintenance.
  • The resistance to high temperatures, abrasion and chemical attacks caused the maintenance costs in the process plant to be significantly reduced and the investment amounts to be reduced in new plant expansion projects.

Related Case Studies

Transport of acid slurry at high temperatures

Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Overcoming Corrosion Challenges in the Oil Industry

Overcoming Corrosion Challenges in the Oil Industry

Petróleos Sudamericanos
Argentina

 | 

2023
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Mining Drainage Lines

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Dewatering without Supports

Open Cast Mine Dewatering

El Volcan Mine Arcelor Mittal
Mexico

 | 

2017