Comparison of brine transport

Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

Case Study Nº

75

Customer

Albemarle Salar
Chile

|

2020

Working Conditions

Flow: 120 m3/h

Pexgol Pipes

Pexgol 200 mm (8”), class 10

Application

Brine transport

Lenght

112 m / 367.45 ft

Categories

Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

The Challenge

Albemarle salar decided to conduct a comparative test on their brine pipelines. The objective was to test the high resistance to scale formation that Pexgol pipes possess compared to conventional high-density polyethylene (HDPE) pipes.

Pexgol Solution

A Pexgol pipe was uncoiled by the main road from the salar to the parapet of 13D well, finally placing the pipe in the direction of 14D well to start the assembly according to its final disposition.

The flexibility of the Pexgol pipe allowed to fit easily into the layout, and its ability to be dragged greatly favored installation time.
Thanks to its high mechanical and impact resistance, Pexgol does not require the use of a special jacket.

For connection to the pump, a flanged coupling was used: clamp-type mechanical accessory with flange adjustment.

Pipe TypePexgol Cost vs OthersPexgol Total Investment Costs vs Others
Rubbed steel A53 Gr, B Sch. 201:1.41:2
Stainless steel 316L, Sch. 201:21:3
Titanium B862, Gr.2, 3 mm thk1:2.31:3.2
Polypropylene PP-H, SDR 171:3.81:4.2

 

Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.
Sedimentation comparison: HDPE pipe after 30 days of use.
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.
Sedimentation comparison: Pexgol pipe after 60 days of use.
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.
After 30 days of operation, the HDPE pipe has incrustations with an approximate thickness of 50 mm.
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.
Cleaning HDPE pipes presents a great physical wear and tear for operators, as they must hit hard to loosen the scale, which means more hours spent on maintenance.

Related Case Studies

Installation of a Pexgol Pipe on top of a Steel Outdated Pipe

Carriage of Chemicals at Sea Port

Ashdod Sea Port
Israel

 | 

2016
Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019
Delivering Durability and Flexibility for a Sustainable Approach to Space Access.

Pioneering Space Launches with Ground-breaking Piping Solutions

SpinLaunch
USA

 | 

2021
Transport of Concentrated Alcohol to 86% for the Production of Rum and Brandy

Transportation of Alcohol for the Production of Rum and Brandy

Cuba Ron
Cuba

 | 

2016
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023