Skip to content

Comparison of brine transport

Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

Case Study Nº

75

Customer

Albemarle Salar
Chile

|

2020

Working Conditions

Flow: 120 m3/h

Pexgol Pipes

Pexgol 200 mm (8”), class 10

Application

Brine transport

Lenght

112 m / 367.45 ft

Categories

Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

The Challenge

Albemarle salar decided to conduct a comparative test on their brine pipelines. The objective was to test the high resistance to scale formation that Pexgol pipes possess compared to conventional high-density polyethylene (HDPE) pipes.

Pexgol Solution

A Pexgol pipe was uncoiled by the main road from the salar to the parapet of 13D well, finally placing the pipe in the direction of 14D well to start the assembly according to its final disposition.

The flexibility of the Pexgol pipe allowed to fit easily into the layout, and its ability to be dragged greatly favored installation time.
Thanks to its high mechanical and impact resistance, Pexgol does not require the use of a special jacket.

For connection to the pump, a flanged coupling was used: clamp-type mechanical accessory with flange adjustment.

Pipe TypePexgol Cost vs OthersPexgol Total Investment Costs vs Others
Rubbed steel A53 Gr, B Sch. 201:1.41:2
Stainless steel 316L, Sch. 201:21:3
Titanium B862, Gr.2, 3 mm thk1:2.31:3.2
Polypropylene PP-H, SDR 171:3.81:4.2

 

Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.
Sedimentation comparison: HDPE pipe after 30 days of use.
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.
Sedimentation comparison: Pexgol pipe after 60 days of use.
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.
After 30 days of operation, the HDPE pipe has incrustations with an approximate thickness of 50 mm.
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.
Cleaning HDPE pipes presents a great physical wear and tear for operators, as they must hit hard to loosen the scale, which means more hours spent on maintenance.

Related Case Studies

Installation of a New Pexgol Pipeline to Provide Hot Water for a Electro-Thermal Storage System.

Hot Water Distribution for Solar Technology

Raygen
Australia

 | 

2021
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Dalvian SA Implements Pexgol for Potable Water Pipeline in the Mountains.

Innovative Solution for Water Supply in Extreme Terrain

Dalvian
Argentina

 | 

2024
Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
Successful outcome in pilot test for SCT Discharge Line with Pexgol.

Advanced piping solutions for handlingscaling fluids

Barrick Gold
Dominican Republic

 | 

2023