Abrasive Tailings Transport

Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Case Study Nº

83

Customer

Pirquitas Mine
Argentina

|

2015

Working Conditions

Temperature: ambient | Pressure: 3 bar

Pexgol Pipes

Pexgol 180 mm (6″), class 15

Application

Tailing transport

Lenght

2 m

Categories

Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

The Challenge

Pirquitas Mine, located in the north of the Argentine territory, required the transportation of abrasive slurry composed of quartz, iron, tin, zinc and lead minerals in a 2 meter section. The old rubber coated steel pipe that was intended for that line had failed due to excess of abrasion.

The use of coated steel or plastic pipe was evaluated.

Pexgol Solution

The client finally decided to install a Pexgol pipe due to its low roughness index and strength against the abrasion presented by the fluid to be transported.

Pexgol is currently has been working 6 times more than the rubber lined steel pipe would have been. Both options were similar in cost.
For the installation, no special tools were needed as the joints were flanged. Only two joins were made.

Related Case Studies

The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Pexgol’s proposal was clear - to provide a pipe that showcased superior wear resistance, estimated to be three times more durable than HDPE.

Transforming Tailings Transport: The Pexgol Advantage

Lundin Mining
Chile

 | 

2021
Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

High Corrosion Resistance Against Brine

Unipar Carbocloro
Brazil

 | 

2019
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017
Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Abrasive Tailings Transport

Pirquitas Mine
Argentina

 | 

2015
Installation of a Pexgol Elbow with Mechanical Joints to Replace HDPE.

Pexgol Elbow for Slurry Transport

Antioquia Gold
Colombia

 | 

2022