Skip to content

Fresh Water Line Optimization in an Oil Field in Argentina

Greater operational efficiency with fewer joints and fast implementation.

Case Study Nº

193

Customer

Phoenix Global Resources
Argentina

|

2025

Working Conditions

Temperature: 20 °C / 68°F | Pressure: 12 kg/cm² | Fluid components: Fresh water

Pexgol Pipes

Pexgol 110 mm, Class 24

Application

Fresh water transport

Lenght

1260 m / 4133 ft

Categories

Fresh Water Line Optimization in an Oil Field in Argentina

The Challenge

Phoenix Global Resources, an independent company focused on hydrocarbon exploration and production in Argentina, required the implementation of a new pipeline to transport fresh water from an intake point to its Central Processing Facility (CPF).

The main challenge of the project was not only the fluid conveyance itself, but also the execution conditions: it was essential to minimize installation time, optimize operational costs, and significantly reduce the number of joints along the pipeline route.

In this context, traditional solutions implied longer installation times, a greater need for fittings, and an increase in potential failure points. Additionally, the operation required a reliable solution capable of working at a pressure of 12 kg/cm² with a constant flow rate, ensuring continuity in the water supply for production processes.

The Solution

For this project, a 110 mm (Class 24) Pexgol pipe was implemented, with a total length of 1,260 meters, designed for fresh water transport under demanding operating conditions.

The selection of Pexgol made it possible to drastically reduce the number of joints thanks to its supply in long continuous lengths, improving system reliability and reducing installation time.

Project execution was completed in just 3 days, including trench installation, jointing through electrofusion and mechanical connections, and the final hydrostatic test.

A key aspect was the technical support provided during installation, as the contractor had no prior experience handling Pexgol pipes. This support ensured proper execution and maximized the system’s benefits from the outset.

Thanks to its flexibility, low weight, and ease of handling, the Pexgol solution enabled a fast, safe, and efficient installation, meeting the client’s objectives in terms of time, costs, and operational reliability.

Related Case Studies

Replacement of a HDPE Pipe for a Pexgol Pipe

Slurry Transportation

Sabinas Mine
Mexico

 | 

2017
Pexgol Transforms Tailings Transportation at Minera San Julián.

Minera San Julián Adopts Pexgol to Improve Water Management

Fresnillo plc
Mexico

 | 

2024
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022
Replacement Of PVC Piping for PE-X in a Industrial Heating System.

Transport of Hot Air for Advanced Agriculture

Teva Post
Israel

 | 

2022
Química del Rey replaced a corroded steel column with a Pexgol line, achieving a faster, safer, and more durable installation.

Reliable Solution for Deep Wells in Corrosive Environments

Química del Rey
Mexico

 | 

2022
Pexgol extends pipe lifespan and reduces maintenance in salt production.

Fewer Shutdowns, Greater Efficiency: Pexgol in the Salt Industry

Sales del Istmo
Mexico

 | 

2023