Greater Efficiency and Safety in Leaching with Pexgol Pipes

Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Case Study Nº

178

Customer

Barrick Gold Corp.
Argentina

|

2025

Working Conditions

Temperature: -25°C to +35°C| Pressure: 1–2 bar | Flow Rate: 25 m³/h per branch (50 m³/h per pad)| Fluid: Cyanide solution (pH 10)

Pexgol Pipes

Pexgol 110 mm, class 10

Application

Cyanide leaching pads for gold and silver recovery

Lenght

300 m / 984 ft

Categories

Greater Efficiency and Safety in Leaching with Pexgol Pipes

The Challenge

Barrick Gold Corp., one of the world’s leading producers of gold and silver, operates under extreme environmental conditions at its Veladero project in Argentina. For its cyanide leaching pads, the company traditionally used 8” HDPE pipelines to transport cyanide solutions (pH 10) across wide temperature ranges, from -25°C to +35°C.

The biggest operational challenge stemmed from the irrigation method: after each leaching cycle, the pipelines were dragged manually to the next cell. This caused significant wear and mechanical fatigue, with HDPE pipes failing after just 4–5 uses. Their weight made handling difficult, increasing safety risks for personnel. Additionally, HDPE’s rigidity required a large number of fittings, particularly to navigate the 90×60-meter leaching pads, leading to higher costs and longer installation times.

Barrick sought a lighter, more flexible, and chemically resistant solution capable of withstanding extreme conditions and improving overall efficiency.

The Solution

To address these issues, Barrick replaced the HDPE system with 300 meters of 110 mm Pexgol Class 10 pipe. Pexgol’s exceptional chemical resistance to cyanide solution and its ability to operate at sub-zero temperatures ensured optimal performance under extreme conditions.

The entire system was installed within a single workday, including staff training, on-site transport, and uncoiling in three stages. Thanks to Pexgol’s natural flexibility, bends and changes in direction were made without fittings, which reduced installation time and material costs. Its light weight allowed for easier and safer handling, even during pipe dragging across leach pads.

With fast deployment, high corrosion resistance, and easy roll transport, Pexgol enabled Barrick to improve operational efficiency. The pipe’s long lifespan—even under frequent dragging—made it a superior alternative to HDPE for cyanide leaching in mining applications.

Related Case Studies

Cement Slurry Injection to an Underground Mine

Backfill

Aguilar Mine
Argentina

 | 

2015
An Outdoor Hydrant and Indoor Sprinklers were installed at Guyana Airport

Water Supply & Fire Extinguisher Line

Cheddi Jagan International Airport
Guyana

 | 

2018
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010
Greater operational efficiency with fewer joints and fast implementation.

Fresh Water Line Optimization in an Oil Field in Argentina

Phoenix Global Resources
Argentina

 | 

2025
Replacing HDPE pipes with Pexgol allowed Vale to simplify operations, eliminate auxiliary equipment, and achieve a permanent installation under extreme conditions.

Comprehensive Redesign of the PumpingSystem with Pexgol at the Sossego Mine

Vale
Brazil

 | 

2024