Skip to content

Water Lines – Harsh Conditions

Transportation of brackish water to the main pumping station

Case Study Nº

9

Customer

Dead Sea Works
Israel

|

1993

Working Conditions

Over 20 years of direct sunlight (UV) exposure. Ambient temperature variation from 47°C to -5°C (116°F to 23°F). Rock build-up from seasonal floods.

Pexgol Pipes

Pexgol ѓ355 Class 10 (SDR 16.2).

Application

Brackish water transportation.

Lenght

120 meters.

Categories

Water Lines - Harsh Conditions

The Challenge

The Rahaf dry riverbed has several powerful seasonal floods every year, causing heavy rocks and soil to drift and swipe everything in its way.

In order to transport water to the main pumping station, which supplied water from the sea to the plant, Dead Sea Works had to lay a waterline of 100 meters across the Rahaf dry riverbed.

Original asbestos pipe laid in a trench crossing the riverbed but the floods uncovered the pipe and damaged it, requiring the replacement of the pipe.

Pexgol Solution

A Pexgol ѓ355 Class 10 (SDR 16.2) pipe was laid in a ditch across the riverbed, without sand embedding.

The original pipe was made from combined short sections that required a complex installation and reinforced foundations. The Mean Time Between Failures (MTBF) was two years.

Since the easy installation of the Pexgol pipe in 1993, it has been working with no failures.

Related Case Studies

Pexgol’s Piping Solution for Regal Petroleum.

Overcoming Piping Challenges in Hydrocarbon Transportation

Regal Petroleum Corporation
Ukraine

 | 

2023
Pexgol Pipe to Transport Effluents at 30°C / 86°F in an Underground Mine.

Pumping Mining Effluents

AngloGold Ashanti
Brazil

 | 

2019
An Outdoor Hydrant and Indoor Sprinklers were installed at Guyana Airport

Water Supply & Fire Extinguisher Line

Cheddi Jagan International Airport
Guyana

 | 

2018
Profertil and the Adaptation to New Chemical Processes with Pexgol.

Efficient Implementation of NaOH Drainage Systems

Pluspetrol
Argentina

 | 

2023
Replacement Of PVC Piping for PE-X in a Industrial Heating System.

Transport of Hot Air for Advanced Agriculture

Teva Post
Israel

 | 

2022
Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010