Skip to content

Water Lines – Harsh Conditions

Transportation of brackish water to the main pumping station

Case Study Nº

9

Customer

Dead Sea Works
Israel

|

1993

Working Conditions

Over 20 years of direct sunlight (UV) exposure. Ambient temperature variation from 47°C to -5°C (116°F to 23°F). Rock build-up from seasonal floods.

Pexgol Pipes

Pexgol ѓ355 Class 10 (SDR 16.2).

Application

Brackish water transportation.

Lenght

120 meters.

Categories

Water Lines - Harsh Conditions

The Challenge

The Rahaf dry riverbed has several powerful seasonal floods every year, causing heavy rocks and soil to drift and swipe everything in its way.

In order to transport water to the main pumping station, which supplied water from the sea to the plant, Dead Sea Works had to lay a waterline of 100 meters across the Rahaf dry riverbed.

Original asbestos pipe laid in a trench crossing the riverbed but the floods uncovered the pipe and damaged it, requiring the replacement of the pipe.

Pexgol Solution

A Pexgol ѓ355 Class 10 (SDR 16.2) pipe was laid in a ditch across the riverbed, without sand embedding.

The original pipe was made from combined short sections that required a complex installation and reinforced foundations. The Mean Time Between Failures (MTBF) was two years.

Since the easy installation of the Pexgol pipe in 1993, it has been working with no failures.

Related Case Studies

Installation of a drainage system between a well and a mining dam.

Drinking Water on Sloping Terrain

AquaMag
Colombia

 | 

2019

Categories:

Installation of Pexgol Pipes for Drainage in a Vertical Ground

Vertical Dewatering

Ferrexpo Poltava Mining
Ukraine

 | 

2019
Mining Effluent Transportation in Cuba.

Pexgol Optimizes Tailings Management at Sherritt’s Moa Nickel Mine

Sherritt
Cuba

 | 

2020
Transport of acid slurry at high temperatures

Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Transformation in the logistics of formation water.

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Aconcagua Energía
Argentina

 | 

2023
Performance evaluation of Pexgol lining under extreme service conditions.

Durable Solution Against Abrasion in Production Facilities: Pexgol at YPF

YPF
Argentina

 | 

2018