Sewage Water Transportation

Case Study Nº

Customer

BorsodChem
Hungary

|

2011

Working Conditions

Extreme corrosion

Pexgol Pipes

Pexgol 200 mm Pexgol. Prefabricated Elbows 200 mm

Application

Sewage Transportation

Lenght

n/a

Categories

The Challenge

BorsodChem requiered to transport sewage water with 300 ppm hydrogen peroxide for a medium of manufacturing procedure of
car-spareparts. The client has tested di erent pipe material such as HDPE, steel and ductile cast iron (both with and without lining), but none of this materials could withstand the corrosion.

Pexgol Solution

The client decided to install a Pexgol pipe 200 mm. The installation was conducted with Plasson HDPE electrofusion technology combined
with butt fusion preparing tools (the butt surfaces of pipes were made plain / the blocking elements of EF couplers were removed — this way the aggresive media could not reach the internal surface of the EF couplers).

The pipe is still working till today withstanding the high corrosive conditions.

Related Case Studies

Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018
Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
Испытание: трубы Pexgol и трубы ПЭНД для транспортировки рассола

Трубы Pexgol в сравнении с трубами ПЭНД для транспортировки рассола

Компания YBL
Боливия

 | 

2017
Монтаж сети пожаротушения на нефтеперерабатывающем заводе.

Водоснабжение для пожарных сетей

КНМ
Аргентина

 | 

2021
Pexgol’s Role in Enhancing Guaymas Protein’s Operations.

Transition to Corrosion-Free Diesel Delivery Systems

Guaymas Protein
Mexico

 | 

2023
Pexgol Pipe Installation for Open Pit Mine Drainage.

Efficient Open Pit Mine Drainage

BHP Escondida Mine
Chile

 | 

2022