Sewage Water Transportation

Case Study Nº

Customer

BorsodChem
Hungary

|

2011

Working Conditions

Extreme corrosion

Pexgol Pipes

Pexgol 200 mm Pexgol. Prefabricated Elbows 200 mm

Application

Sewage Transportation

Lenght

n/a

Categories

The Challenge

BorsodChem requiered to transport sewage water with 300 ppm hydrogen peroxide for a medium of manufacturing procedure of
car-spareparts. The client has tested di erent pipe material such as HDPE, steel and ductile cast iron (both with and without lining), but none of this materials could withstand the corrosion.

Pexgol Solution

The client decided to install a Pexgol pipe 200 mm. The installation was conducted with Plasson HDPE electrofusion technology combined
with butt fusion preparing tools (the butt surfaces of pipes were made plain / the blocking elements of EF couplers were removed — this way the aggresive media could not reach the internal surface of the EF couplers).

The pipe is still working till today withstanding the high corrosive conditions.

Related Case Studies

Replacement of Carbon Steel Pipes with Pexgol for the Transportation of Natural Gas.

Natural Gas Transportation with Pexgol

YPF
Argentina

 | 

2022
Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Greater Efficiency and Safety in Leaching with Pexgol Pipes

Barrick Gold Corp.
Argentina

 | 

2025
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022
Pexgol’s piping system enabled Nexa Resources to revamp their waste management process, significantly reducing environmental impact.

Enhancing Nexa Resource’s Waste Management Using Pexgol Pipes

Nexa Resources
Brazil

 | 

2023
Прокладка труб из сшитого ПЭ длиной 3000 метров для подземного рудника.

Дренажные линии в подземном руднике

Lundin Mining — Рудник Канделария-Норте
Чили

 | 

2020
Горячий сильвинитовый насыщенный рассол с температурой 114 °C (237 °F)

Переработка минерального сырья — установка по переработке углекислого калия

ICL group, работы на Мертвом море
Израиль

 | 

1987