Working Conditions

Temperature: Ambient | Pressure: Atmospheric | Flow Rate: 50 liters/hour | Fluid Components: 50% Sodium Hydroxide

Pexgol Pipes

Pexgol 160 mm, class 15

Application

Sodium Hydroxide Discharge

Lenght

10 m / 32 ft

Categories

Efficient Implementation of NaOH Drainage Systems

The Challenge

Profertil, a leading company in the production and commercialization of soil nutrients in Argentina, faced a significant challenge at its plant. With the recent modification of their processes to include the discharge of 50% sodium hydroxide (NaOH), it became imperative to develop suitable infrastructure to handle this highly corrosive chemical.

The original unloading system was not designed for NaOH, necessitating the creation of a completely new system capable of handling the unique specifications of this chemical.

The Solution

Profertil decided to implement a solution using a 10-meter Pexgol pipe, leveraging pipes that the company had already acquired for another project. Pexgol was chosen due to its high resistance to chemicals, durability against corrosion,
and ease of handling and installation. The project involved excavation and civil works necessary to install and connect the new piping to the collection chambers, followed by paving the surface to ensure the system’s integrity.

The installation of the Pexgol pipe was successfully completed, connecting the collection chambers in the truck unloading area. This system now efficiently handles the excess NaOH and wash water, combining and draining them without incidents. Since its commissioning four months ago, the infrastructure has operated without issues, demonstrating Pexgol’s ability to adapt to Profertil’s specific industrial chemical handling needs.

The client, Profertil, expressed satisfaction with the versatility and effectiveness of the solutions provided by Pexgol, highlighting the quick installation and reduced risks associated with handling corrosive substances.

Related Case Studies

Транспортировка воды под высоким давлением для золотого рудника.

Транспортировка воды под высоким давлением

Рудник Mansfield
Аргентина

 | 

2019
Замена трубы ПЭНД на трубу компании Pexgol

Транспортировка суспензии

Шахта Tizapa
Мексика

 | 

2015
Pexgol Pipe Installation for Open Pit Mine Drainage.

Efficient Open Pit Mine Drainage

BHP Escondida Mine
Chile

 | 

2022
Транспортировка воды через стволы шахт

Откачка воды из карьера

Компания Agnico Eagle, шахта Pinos Altos
Мексика

 | 

2017
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Potable Water Supply on Harsh Terrain

Снабжение питьевой водой в труднопроходимой местности

Компания водоснабжения Mekorot / Beit Shemesh Water Company
Израиль

 | 

2017