Skip to content

Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Transforming water transportation with Pexgol technology

Case Study Nº

154

Customer

Comisión Federal de Electricidad
Mexico

|

2023

Working Conditions

Temperature: 30°C / 86°F | Pressure: 8kg

Pexgol Pipes

Pexgol 6″, class 15

Application

Sea water transport

Lenght

150 m / 15748 ft 90° elbows and mechanical flanged joints

Categories

Pexgol’s Solution for CFE: A Leap inDurability and Efficiency

The Challenge

The Federal Electricity Commission (CFE), Mexico’s leading electricity company, at its Empalme (Sonora) facility, faced significant challenges with its existing stainless steel pipelines used for transporting treated seawater. The saline environment and corrosive nature of seawater led to frequent corrosion of the steel pipes, requiring constant shortterm maintenance efforts. Seawater is used for cooling turbines, so any failure in the line can lead to downtime in production. Replacing stainless steel pipes required skilled welders and large cranes to handle the tubes due to their high weight.

The Solution

Pexgol provided a comprehensive solution with its 6” RD11 pipes, specifically designed for challenging conditions like those at CFE. Pexgol pipes, known for their high chemical resistance and corrosion resistance, offered a robust alternative to stainless steel.

Pexgol’s flanged coupling and elbow fittings facilitated a smooth installation process on the existing rack, and the lightweight nature of Pexgol pipes allowed for easier handling and maneuvering during installation. Quickpipes Systems provided on-site
technical support, ensuring a seamless transition to Pexgol pipes. This solution not only accelerated the installation process but also significantly reduced maintenance needs, thanks to Pexgol’s durability and the long pipe lengths that minimized the need
for joints.

Related Case Studies

Откачка воды без опор

Откачка воды из карьера

Компания Arcelor Mittal, шахта El Volcan
Мексика

 | 

2017
Монтаж труб Pexgol для вертикального дренажа

Вертикальный отвод вод

Полтавский ГОК, Ferrexpo
Украина

 | 

2019
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
600 Meters Installed in a Day: Pexgol Delivers for Kiewit in Power Project.

Pexgol Ensures Water Supply at Mexican Combined-Cycle Power Plant

Kimex
Mexico

 | 

2025
Транспортировка фосфорной кислоты на заводе по производству нитрата калия

Транспортировка фосфорной кислоты

Компания Haifa Chemicals
Израиль

 | 

1995
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022