Replacement of a Steel Spool with Pexgol

Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Case Study Nº

106

Customer

Enap Sipetrol
Ecuador

|

2021

Working Conditions

Pressure: 10 PSI | Temperature: 71°C / 160°F

Pexgol Pipes

6”x4” steel eccentric reducer coated in Pexgol

Application

Formation water pumping

Lenght

n/a

Categories

The Challenge

Enap Sipetrol Ecuador, is a branch of the Chilean state oil company Enap, is the operator and owner of 42% of Block 28 in the southeastern area of Ecuador.

In their process plant where it was necessary to transport formation water, they had a steel spool coated internally with epoxy paint and it corroded easily due to the aggressiveness of the fluid.

Pexgol Solution

The client decided to replace the steel spool with Pexgol. It was installed in October 2021 and inspected in March 2022 and no type of corrosion or adhesion of solids was observed.

Related Case Studies

Монтаж дренажной системы между скважиной и рудничной дамбой.

Дренирование скважины возле рудничной дамбы

CODELCO — Рудник Эль-Тениенте
Чили

 | 

2019
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Горячий сильвинитовый насыщенный рассол с температурой 114 °C (237 °F)

Переработка минерального сырья — установка по переработке углекислого калия

ICL group, работы на Мертвом море
Израиль

 | 

1987
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
Монтаж дренажной системы между дамбами на медном руднике.

Транспортировка воды между дамбами

CODELCO — Рудник Эль-Тениенте
Чили

 | 

2019
Монтаж труб Pexgol для транспортировки абразивных хвостов.

Транспортировка абразивных хвостов

Рудник Пиркитас
Аргентина

 | 

2015