Replacement of Corroded Pipeline in Oil &Gas: Pexgol Solution in Argentina

Efficient solution for transporting produced water with hydrocarbons under demanding conditions.

Case Study Nº

191

Customer

Petróleos Sudamericanos
Argentina

|

2025

Working Conditions

Temperature: 40°C / 104°F | Pressure: 10 kg/cm² | Fluid components: Water and hydrocarbons

Pexgol Pipes

Pexgol 160 mm, class 15

Application

Formation water transport

Lenght

1140 m / 3740 ft

Categories

Replacement of Corroded Pipeline in Oil &Gas: Pexgol Solution in Argentina

The Challenge

Petróleos Sudamericanos, an Argentine company focused on hydrocarbon exploration and production, faced an operational challenge at the Catriel Oeste field related to the transport of produced water containing hydrocarbons.

The existing infrastructure showed critical deterioration due to accelerated internal corrosion caused by the chemical nature of the fluid. This condition led to recurring failures in the pipeline, requiring welding repairs every six months. As a result, unplanned shutdowns occurred along with a continuous increase in maintenance costs, compromising the operational continuity of the system.

The project required transporting water with hydrocarbons at a temperature of 40°C and a pressure of 10 kg/cm² over a 1,140-meter pipeline using 160 mm (Class 15) pipe, under typical Oil & Gas operating conditions where system reliability is critical.

The Solution

To address this issue, a Pexgol (PE-Xa) piping system was implemented, selected for its high chemical resistance and its ability to operate reliably in aggressive environments. The solution eliminated the primary failure mechanism associated with corrosion, significantly extending the system’s service life and reducing the need for corrective maintenance.

The material’s flexibility and supply in long continuous lengths enabled a fast and efficient installation, minimizing the number of joints and potential failure points. The project execution was completed in just two working days, including pipe laying, installation of four mechanical couplings at critical points, and hydrostatic testing to ensure system integrity.

As a result, the operation achieved higher reliability, reduced operational costs, and eliminated unplanned shutdowns, positioning Pexgol as an efficient and long-term solution for fluid transport applications in the Oil & Gas industry.

Related Case Studies

Replacement of a Drainage Line in an Underground Mine.

Drainage in Underground Mine

Atacama Kozan
Chile

 | 

2019
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
A high-precision maneuver enabled the complete assembly of the system in record time, ensuring safety and operational continuity.

Pexgol Overcomes Extreme Dewatering Conditions in La Ciénega

Fresnillo Plc.
Mexico

 | 

2025
Installation of Pexgol Pipes to Transport Fish.

Fish Discharge Lines

TASA
Peru

 | 

2018

Categories:

Enhancing Efficiency and Durability in the Construction of Aerial Pipelines.

Facing the Challenges of the Neuquén Terrain in Argentina

Pluspetrol
Argentina

 | 

2023
Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

Pexgol’s Pipe Solution Enhances Salmon Farming

Mowi
Chile

 | 

2021