Replacement of Corroded Pipeline in Oil &Gas: Pexgol Solution in Argentina

Efficient solution for transporting produced water with hydrocarbons under demanding conditions.

Estudo de Caso Nº

191

Cliente

Petróleos Sudamericanos
Argentina

|

2025

Condições de Trabalho

Temperature: 40°C / 104°F | Pressure: 10 kg/cm² | Fluid components: Water and hydrocarbons

Solução Pexgol

Pexgol 160 mm, class 15

Aplicação

Formation water transport

Comprimento

1140 m / 3740 ft

Categorias

Replacement of Corroded Pipeline in Oil &Gas: Pexgol Solution in Argentina

The Challenge

Petróleos Sudamericanos, an Argentine company focused on hydrocarbon exploration and production, faced an operational challenge at the Catriel Oeste field related to the transport of produced water containing hydrocarbons.

The existing infrastructure showed critical deterioration due to accelerated internal corrosion caused by the chemical nature of the fluid. This condition led to recurring failures in the pipeline, requiring welding repairs every six months. As a result, unplanned shutdowns occurred along with a continuous increase in maintenance costs, compromising the operational continuity of the system.

The project required transporting water with hydrocarbons at a temperature of 40°C and a pressure of 10 kg/cm² over a 1,140-meter pipeline using 160 mm (Class 15) pipe, under typical Oil & Gas operating conditions where system reliability is critical.

The Solution

To address this issue, a Pexgol (PE-Xa) piping system was implemented, selected for its high chemical resistance and its ability to operate reliably in aggressive environments. The solution eliminated the primary failure mechanism associated with corrosion, significantly extending the system’s service life and reducing the need for corrective maintenance.

The material’s flexibility and supply in long continuous lengths enabled a fast and efficient installation, minimizing the number of joints and potential failure points. The project execution was completed in just two working days, including pipe laying, installation of four mechanical couplings at critical points, and hydrostatic testing to ensure system integrity.

As a result, the operation achieved higher reliability, reduced operational costs, and eliminated unplanned shutdowns, positioning Pexgol as an efficient and long-term solution for fluid transport applications in the Oil & Gas industry.

Estudos de Caso Relacionados

Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019
Installation of a Pexgol Elbow with Mechanical Joints to Replace HDPE.

Pexgol Elbow for Slurry Transport

Antioquia Gold
Colombia

 | 

2022
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Transport of acid slurry at high temperatures

Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Pexgol Pipe Installation for Open Pit Mine Drainage.

Efficient Open Pit Mine Drainage

BHP Escondida Mine
Chile

 | 

2022