Process Water – Brine Transportation

Scale build up reduction - highly concentrated lime solution

Case Study Nº

7

Customer

SQM Nueva Victoria-Iquique
Chile

|

2010

Working Conditions

Corrosion and material build-up with high concentration.

Pexgol Pipes

Pexgol 315 x 28.6, Class 15.

Application

Transport of highly concentrated brine solution.

Lenght

12 meters.

Categories

Process Water - Brine Transportation

The Challenge

As the solution was being pumped, calcium carbonate deposits caused clogging in the existing HDPE pipe wall in both the straight parts of the circuit as well as the elbows. This clogging prevented the evaporation pools from receiving the required amount of lime water. Clogs formed every 2 months, affecting production.

The plant’s operators needed to reduce this effect or eliminate it by replacing the pipe with another.

Pexgol Solution

Due to the replacement of HDPE pipes with the smooth internal surface of Pexgol’s pipes, clogs were completely eliminated. In addition, the production and transportation of the new pipes in coils reduced the number of joints, which was a major source of deposition.

A Pexgol pipe was installed between two HDPE pipes and connected by Vitaulic joints 994. After two months the pipes were removed for inspection and no deposition was found, while the HDPE pipe did.

Since the installation of the new pipes in 2010, the original Mean Time Between Failures (MTBF) of the HDPE pipes – of two months – has been completely eliminated. Pexgol’s pipes have never failed or clogged.

Related Case Studies

Trial Demonstrates Superior Wear Resistance in Sea Water + Ash Slurry Conditions.

Unmatched Durability in Harsh Slurry: Pexgol Outperforms Steel

Tata Power
India

 | 

2023
Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Greater Efficiency and Safety in Leaching with Pexgol Pipes

Barrick Gold Corp.
Argentina

 | 

2025
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018
Replacement of a Drainage Line in an Underground Mine.

Drainage in Underground Mine

Atacama Kozan
Chile

 | 

2019
The impact of Pexgol piping on pump performance improvement and maintenance cost reduction at Sales de Jujuy.

Improvement in Brine Management through Pexgol Piping

Sales de Jujuy
Argentina

 | 

2023
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019