Skip to content

Extraction of Underground Water

Extraction of underground water through wells

Case Study Nº

24

Customer

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

|

2010

Working Conditions

Extreme environmental temperatures (-25°C to 40°C).

Pexgol Pipes

Pexgol 280 mm, Class 10.

Application

Underground water extraction.

Lenght

200 m.

Categories

Extraction of underground water through wells

The Challenge

Collahuasi Mine extracted process water through wells, they used a galvanized steel pipe. This pipe had several failures on its joints and demanded a long time installation process (around 3 days).

The client required a more flexible pipe, with longer working life than the steel, in order to keep the operations stable and minimized the stops in the plant for maintenance.

Pexgol Solution

A Pexgol pipe was installed in less than 3 hours, reducing 24 times the average installation time. Its weight was lighter than steel (70% less), so it involved less workers, less tolls, and less equipment to leave the well full operative. During the working life of the well, the Pexgol pipe didn’t require any sort of maintenance, and it was employed after in another application at the plant.

Related Case Studies

Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Installation of a Fire Supply Network in a Oil Treatment Plant.

Fire Network Supply

YPF
Argentina

 | 

2021
Pexgol’s Role in Enhancing Guaymas Protein’s Operations.

Transition to Corrosion-Free Diesel Delivery Systems

Guaymas Protein
Mexico

 | 

2023
Replacement Of PVC Piping for PE-X in a Industrial Heating System.

Transport of Hot Air for Advanced Agriculture

Teva Post
Israel

 | 

2022
Transportation of Phosphoric acid in a potassium nitrate plant

Transportation of Phosphoric Acid

Haifa Chemicals
Israel

 | 

1995
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017