Transport of Compressed Air

Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

Case Study Nº

66

Customer

Meridian Mine – Faena El Peñón
Chile

|

2018

Working Conditions

Pressure: 10 bar

Pexgol Pipes

Pexgol 160 mm (6”), Class 15

Application

Transport of compressed air

Lenght

1800 m

Categories

Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

The Challenge

The Meridian Mine (Faena El Peñón) required the installation of a line for the transport of compressed air from the surface (horizontal), crossing roads of mining vehicles, ending 200 meters deep inside an underground mine through a vertical chimney.
The line had to withstand 10 bar of pressure.

Pexgol Solution

The client decided to install a 160 mm (6”) Pexgol pipe class 15 SDR 11 of 1800 meters in coils of 600 meters each.
Pexgol pipe was selected due to it advantages:

  • Less joints were needed, contributing to saving costs and giving more reliability to the line.
  • Resistance to mechanical stresses involved in installing at mining crossroads, using a 1.5 meter ditch and filling with material from the same ditch, without using a steel jacket.
  • Resistance to changes in ambient temperature (5°C to 30°C).
  • Creep resistance.

The installation was simple: only 4 mechanical connections were used, selected by the mining company without using special tools. If HDPE pipes were used, about 150 mechanical connections would have been required.

Also, to support the Pexgol pipes in the upper zone, before entering the underground mine by the chimney, a mechanical system designed by the mining company was incorporated.

Related Case Studies

A Challenging Project That Eliminated Booster Stations Thanks to Pexgol’s Flexibility.

Vertical Solution for Mine Dewatering in Fresnillo

Fresnillo
Mexico

 | 

2025
Installation of Pexgol Pipes for a Free Chlorine Potable Water Supply.

Free Chlorine Potable Water Supply

Rabin Medical Center
Israel

 | 

2020
A Two-Phase Installation for High-Temperature Hot Water Supply & Return.

Scaling Up Efficiency: District Energy at Penn State Harrisburg

Penn State University - Harrisburg
USA

 | 

2021
Installation Of Pexgol Hanging Pipes In Underground Mine

Underground Mine Dewatering

Codelco Chuquicamata
Chile

 | 

2017
Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Success in Agricultural Desalination: Water Supply Challenges

BerryMex
Mexico

 | 

2019
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024