Potable Water Supply on Harsh Terrain

Case Study Nº

48

Customer

Mekorot / Beit Shemesh Water Company
Israel

|

2017

Working Conditions

High pressure (12 bar), possible water hammers & complicate terrain.

Pexgol Pipes

Pexgol 630 mm, Class 15

Application

Drinking Water Transportation

Lenght

1.3 km

Categories

Potable Water Supply on Harsh Terrain

The Challenge

The Municipal Water Company of Beit Shemesh (Israel) in cooperation with the Ministry of Construction and Housing of Israel required to install a main potable water supply line from Mekorot to the city of Beit Shemesh. The line brought high pressure water from Mekorot, and goes along a national route to a reservoir that supplies drinking water to thousands of housing units in the developing Ramat Beit Shemesh area.

The line connecting the Mekorot station to the water reservoir runs along a very complex rocky road characterized by many twists and turns, within a forested path protected by the authorities, at altitudes close to 100 meters, and ancient areas that are forbidden to be excavated.

To implement the project, it was required a pipeline that could cope with a combination of high pressures, a very dynamic pressure regime and to be suitable for transportation and installation under very aggressive conditions.

In addition, the pipe line needed to be anti-static and / or a pipe made of insulating material that would be impervious to electric shocks since a parallel pipe line was placed with power lines.

Pexgol Solution

The outstanding capabilities of Pexgol pipes led to the selection of this reliable system for the installation.

To meet the strictest standards in terms of quality, safety and preservation of the environment a Pexgol pipe line of 1.3 km was installed. The installation was done 15 meters underground in a very harsh environment that required constant dragging of the pipe.

The natural bending radius of the pipes were key to the success of this project. Furthermore, the line was capable of supporting water hammers caused by the pumping from the Water Company.

Additionally a 200 meters section was installed by horizontal drilling inside an existing steel pipe line. The Pexgol pipe section for this part was cover with plastic spacers to separate it from the current pipe.

Overall the installation took 20 days without any special equipment. With other pipe materials such as PE, it could take 3 or 4 times more since extreme precautions needed to be done to avoid damaging the pipes and connecting between sections on this harsh terrain.

Related Case Studies

Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Water Drainage From the Inside of an Underground Mine

Water Drainage at an Underground Mine

El Peñón Yamana Gold, Meridian Mine
Chile

 | 

2016
Pexgol’s piping system enabled Nexa Resources to revamp their waste management process, significantly reducing environmental impact.

Enhancing Nexa Resource’s Waste Management Using Pexgol Pipes

Nexa Resources
Brazil

 | 

2023
Innovation and improvement in fluid transportation in the oil and gas industry.

Streamlining Effluent Treatment with Pexgol

Pan American Energy
Argentina

 | 

2023
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Slurry transportation with high nickel levels

Leached Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2013