Skip to content

Water Transport Between Dams

Installation of a Drainage System between Dams in a Copper Mine.

Case Study Nº

77

Customer

CODELCO – El Teniente Mine
Chile

|

2019

Working Conditions

Extreme temperatures -10° to 40°C / 14° to 104°F

Pexgol Pipes

Pexgol 160 mm (6”), class 15

Application

Dewatering

Lenght

5600 m / 18372.7 ft

Categories

Installation of a Drainage System between Dams in a Copper Mine.

The Challenge

Cooperación del Cobre de Chile (CODELCO) required transporting water from the Barahona dam to a specific sector of the Caletones smelter, located south of the dam. The line was due to be installed in less than 10 weeks.

The distance of the route, in addition to other works being carried out on site and the vehicular flow, made it critical that the pipeline needed to be installed in the shortest time possible.

Pexgol Solution

The client made an economic evaluation, considering the installation time of the HDPE versus PE-X pipes from Pexgol. Pexgol was finally chosen.

The delivery format in coil of long lengths, allowed the totality of meters to be delivered in only 10 coils.
Installation was exceptionally fast. The uncoiling allowed up to 6 drums per day to be released, the sections to be located in their final location and subsequently joined with the relevant couplings, within 6 days.

As for the accessories, 9 electrofusion couplings were used.
The final experience was very satisfying.

Related Case Studies

Improving drainage in the Media Luna mine with Pexgol.

Overcoming Geotechnical Challenges with Pexgol at Media Luna

Minera Media Luna
Mexico

 | 

2023
Pexgol’s proposal was clear - to provide a pipe that showcased superior wear resistance, estimated to be three times more durable than HDPE.

Transforming Tailings Transport: The Pexgol Advantage

Lundin Mining
Chile

 | 

2021
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018
Transport of Formation Water with Hydrocarbons.

Formation Water Transport

ROCH
Argentina

 | 

2015
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019
Transport of acid water at high temperatures

Water Transport with Low pH Level

Moa Nickel S.A. Sherritt
Cuba

 | 

2010