Drainage Lines in Underground Mine

Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Case Study Nº

73

Customer

Lundin Mining – Candelaria Norte Mine
Chile

|

2020

Working Conditions

Underground work

Pexgol Pipes

Pexgol 160 mm (6”), class 19

Application

Dewatering

Lenght

3000 m

Categories

Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

The Challenge

Lundin Mining at Calendaria Norte Mine had to install a drainage line for its underground mine, where the main challenge was to pass it through the main ramp of the mine, which is only available once a month during its maintenance (since the operation of the mine cannot be stopped).

Pexgol Solution

The client decided to install 3,000 meters of Pexgol pipe that was supplied in five coils of 600 meters each. Two main maintenances were scheduled, where three coils per day (1800 meters) were unrolled and installed.

Cross-linked polyethylene was chosen because of:

  • Its long-length supply format.
  • Ease of installation, thanks to the flexibility of the pipe that was easy to accommodate in the curves of the interior of the mine.
  • Limited installation times to avoid stopping the mining operation.

Installation was quick and easy, uncoiling the full length of the pipeline and then dragging it into the mine.

Related Case Studies

Installation of a Fire Supply Network in a Oil Treatment Plant.

Fire Network Supply

YPF
Argentina

 | 

2021
A Challenging Project That Eliminated Booster Stations Thanks to Pexgol’s Flexibility.

Vertical Solution for Mine Dewatering in Fresnillo

Fresnillo
Mexico

 | 

2025
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022
Food Transport Pexgol vs HDPE

Food Transport Pexgol vs HDPE

Marine Farms
Chile

 | 

2017
Replacement of a HDPE Pipe for a Pexgol Pipe

Compressed Air Transportation

Saucito S.A. de C.V. Mine
Mexico

 | 

2017
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017