Working Conditions

Pressure: 10 bar

Pexgol Pipes

Pexgol 160 mm (6”), Class 15

Application

Transport of compressed air

Lenght

1800 m

Categories

Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

The Challenge

The Meridian Mine (Faena El Peñón) required the installation of a line for the transport of compressed air from the surface (horizontal), crossing roads of mining vehicles, ending 200 meters deep inside an underground mine through a vertical chimney.
The line had to withstand 10 bar of pressure.

Pexgol Solution

The client decided to install a 160 mm (6”) Pexgol pipe class 15 SDR 11 of 1800 meters in coils of 600 meters each.
Pexgol pipe was selected due to it advantages:

  • Less joints were needed, contributing to saving costs and giving more reliability to the line.
  • Resistance to mechanical stresses involved in installing at mining crossroads, using a 1.5 meter ditch and filling with material from the same ditch, without using a steel jacket.
  • Resistance to changes in ambient temperature (5°C to 30°C).
  • Creep resistance.

The installation was simple: only 4 mechanical connections were used, selected by the mining company without using special tools. If HDPE pipes were used, about 150 mechanical connections would have been required.

Also, to support the Pexgol pipes in the upper zone, before entering the underground mine by the chimney, a mechanical system designed by the mining company was incorporated.

Related Case Studies

Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
The innovative solution from Pexgol for Anglo American Peru’s piping challenges.

Navigating extreme conditions with Pexgol’s PE-X pipes

Anglo American Perú
Peru

 | 

2023
Installation of Pexgol Pipes for a Compress Air System.

Compressed Air System

Rav-Gon Printing House
Israel

 | 

2020
Boosting Productivity and Reducing Maintenance in Livestock Feed Production.

From Steel Struggles to Pexgol Progress

Ambar
Israel

 | 

2022
Reduced wear and increased durability in the sand cleaning process at KSB de México.

Improving efficiency in steel foundry with Pexgol

KSB de Mexico
Mexico

 | 

2023
Transport of high corrosive material from the thickeners to the neutralization plant

Corrosive Material Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015