Transport of Silica Arena: HDPE vs Pexgol

Test Installation for Transporting Silica Sand.

Case Study Nº

90

Customer

Covia Corp
Mexico

|

2019

Working Conditions

Pneumatic transport at 6 bar

Pexgol Pipes

Pexgol Elbow 90° 225 mm (8”), Class 15 | Pexgol Flange Coupler 225 mm (8”)

Application

Transport of Silica Arena

Lenght

Categories

Test Installation for Transporting Silica Sand.

The Challenge

Covia Corp, a leading company in the manufacture and sale of industrial minerals in Mexico, required to pneumatic transport silica sand at 6 bar (with 50% solids). Initially they worked with 225mm (8”) HDPE pipes that suffered from high levels of wear at the elbows due to abrasion of the material it was carrying.

Pexgol Solution

The client decided to replace one of the HDPE elbows with a Pexgol 90° 225 mm (8”) class 15 and test it for 3 months.
HDPE elbows generally lasted up to a month and a half of work. The Pexgol elbow had to at least double the operating time to pass the test.

After 3 months of testing it was shown that Pexgol exceeded expectations. It’s been more than a year and the elbows continue to function without problems.

Only torque wrenches were used for the installation.

Related Case Studies

Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Coarse NACL (SALT) Dredging Tailing

Slurry Lines – Abrasive Dredged Material

ICL group, Dead Sea Works
Israel

 | 

1992
Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
Installation of Pexgol pipes for the transport of formation water (gas and minerals)

Gas Wells: Formation Water Treatment

Canacol
Colombia

 | 

2018
Installation of Pexgol Pipes in a Fish Processing Plant.

Fish Oil Transport at 36°C / 96.8°F

Guaymas Protein Company
Mexico

 | 

2018
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017