Water Transportation

Replacement of Carbon Steel Pipe for a Pexgol Pipe

Case Study Nº

42

Customer

Cargill
Mexico

|

2017

Working Conditions

Work done at -65 meters

Pexgol Pipes

Pexgol 100 mm (4″) SDR 11.

Application

Water transportation.

Lenght

50 meters.

Categories

Replacement of Carbon Steel Pipe for a Pexgol Pipe

The Challenge

In the plant “Purina” the water for production is taken from a well.

Originally they used carbon steel pipes to transport the water, which were useful only for a year, then they had to change the pipes since they suffered serious corrosion problems.

This phenomenon happened due to the high sodium content of the groundwater.

Pexgol Solution

The customer required a flexible pipe with a longer service life than carbon steel pipes to maintain a stable operation and minimize sudden stoppages for maintenance operations.

It was, therefore, decided to supply a pipe of 110 mm diameter in a single section which can withstand without any inconvenience the weight of the pump, the cables, the water column and the weight of the pipe.

Related Case Studies

Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018
Pexgol extends pipe lifespan and reduces maintenance in salt production.

Fewer Shutdowns, Greater Efficiency: Pexgol in the Salt Industry

Sales del Istmo
Mexico

 | 

2023
Securing the future of gold mining: Newmont Corporation chooses Pexgol for water transport

Newmont’s Water Transportation Revolution with Pexgol Pipes

Newmont Corporation
Argentina

 | 

2018
EMESA Optimizes Formation Water Transportation in Mendoza.

Pexgol’s Solution in Secondary Recovery for EMESA

EMESA
Argentina

 | 

2023
Slurry transportation with high nickel levels

Leached Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2013
Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010