Skip to content

Water Transportation

Replacement of Carbon Steel Pipe for a Pexgol Pipe

Estudo de Caso Nº

42

Cliente

Cargill
Mexico

|

2017

Condições de Trabalho

Work done at -65 meters

Solução Pexgol

Pexgol 100 mm (4″) SDR 11.

Aplicação

Water transportation.

Comprimento

50 meters.

Categorias

Replacement of Carbon Steel Pipe for a Pexgol Pipe

The Challenge

In the plant “Purina” the water for production is taken from a well.

Originally they used carbon steel pipes to transport the water, which were useful only for a year, then they had to change the pipes since they suffered serious corrosion problems.

This phenomenon happened due to the high sodium content of the groundwater.

Pexgol Solution

The customer required a flexible pipe with a longer service life than carbon steel pipes to maintain a stable operation and minimize sudden stoppages for maintenance operations.

It was, therefore, decided to supply a pipe of 110 mm diameter in a single section which can withstand without any inconvenience the weight of the pump, the cables, the water column and the weight of the pipe.

Estudos de Caso Relacionados

Replacing HDPE pipes with Pexgol allowed Vale to simplify operations, eliminate auxiliary equipment, and achieve a permanent installation under extreme conditions.

Comprehensive Redesign of the PumpingSystem with Pexgol at the Sossego Mine

Vale
Brazil

 | 

2024
Water transportation with sulfide and cobalt particles

Water and Sulfide Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Installation of a Fire Supply Network in a Oil Treatment Plant.

Fire Network Supply

YPF
Argentina

 | 

2021
Reducing maintenance and increasing safety in hydraulic backfill operations.

Pexgol Simplifies Slurry Transportation at Buriticá Mine

Zijin - Continental Gold
Colombia

 | 

2023
Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Installation of Pexgol Pipe to Transport Brine at High Pressure in a Borehole.

Transporting Brine at High Pressure

Mekorot
Israel

 | 

2020