Skip to content

Efficient Implementation of NaOH Drainage Systems

Profertil and the Adaptation to New Chemical Processes with Pexgol.

Case Study Nº

161

Customer

Pluspetrol
Argentina

|

2023

Working Conditions

Temperature: Ambient | Pressure: Atmospheric | Flow Rate: 50 liters/hour | Fluid Components: 50% Sodium Hydroxide

Pexgol Pipes

Pexgol 160 mm, class 15

Application

Sodium Hydroxide Discharge

Lenght

10 m / 32 ft

Categories

Efficient Implementation of NaOH Drainage Systems

The Challenge

Profertil, a leading company in the production and commercialization of soil nutrients in Argentina, faced a significant challenge at its plant. With the recent modification of their processes to include the discharge of 50% sodium hydroxide (NaOH), it became imperative to develop suitable infrastructure to handle this highly corrosive chemical.

The original unloading system was not designed for NaOH, necessitating the creation of a completely new system capable of handling the unique specifications of this chemical.

The Solution

Profertil decided to implement a solution using a 10-meter Pexgol pipe, leveraging pipes that the company had already acquired for another project. Pexgol was chosen due to its high resistance to chemicals, durability against corrosion,
and ease of handling and installation. The project involved excavation and civil works necessary to install and connect the new piping to the collection chambers, followed by paving the surface to ensure the system’s integrity.

The installation of the Pexgol pipe was successfully completed, connecting the collection chambers in the truck unloading area. This system now efficiently handles the excess NaOH and wash water, combining and draining them without incidents. Since its commissioning four months ago, the infrastructure has operated without issues, demonstrating Pexgol’s ability to adapt to Profertil’s specific industrial chemical handling needs.

The client, Profertil, expressed satisfaction with the versatility and effectiveness of the solutions provided by Pexgol, highlighting the quick installation and reduced risks associated with handling corrosive substances.

Related Case Studies

Installation of a Drainage System between a Well and a Mining Dam.

Well Drainage at Mining Dam

CODELCO – El Teniente Mine
Chile

 | 

2019
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017
Coarse NACL (SALT) Dredging Tailing

Slurry Lines – Abrasive Dredged Material

ICL group, Dead Sea Works
Israel

 | 

1992
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Installation of Pexgol Pipes to Transport Fish.

Fish Discharge Lines

TASA
Peru

 | 

2018

Categories:

Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020