From carbon steel to Pexgol: A victory against corrosion

Pexgol helped Profertil to overcome the corrosion challenge in its fire protection network.

Case Study Nº

133

Customer

Profertil
Argentina

|

2021

Working Conditions

Ambient temperature | Pressure: 10 kg/cm2

Pexgol Pipes

Pexgol 63, 180, 225, 250 & 250 mm, class 15

Application

Fire Protection Network

Lenght

2000 m / 6562 ft

Categories

From carbon steel to Pexgol: A victory against corrosion

The Challenge

Profertil, a leading producer and supplier of soil nutrients with an annual production capacity of 1,320,000 tons of Urea and 790,000 tons of ammonia, faced a critical challenge at their Bahia Blanca facility in Argentina in 2021. The fire protection network in their plant, originally made from carbon steel, was highly susceptible to corrosion due to two distinct factors: the hardness of the water running through the pipes, causing internal corrosion, and the high salt content in the coastal soil, inducing external corrosion. This corrosion was causing leaks in the pipes, compromising the effectiveness of their crucial fire protection network.

Pexgol Solution

Pexgol provided an effective and efficient solution to Profertil’s problem with its range of corrosion-resistant PE-X pipes. Pexgol pipes of various sizes (63, 180, 225, 250, and 280 mm) were used to replace the 2000 meters (6562 feet) of the existing fire protection network.

Pexgol’s fusion couplers, flange couplers, PE-X coated fittings, Pexgol reducers, Pexgol elbows, and fire hydrant connectors were used in the installation process. The installation was smooth and straightforward, thanks to Pexgol’s flexible material that offers rapid installation and reliability, a major advantage over the previous carbon steel system.

The local team, ArgPex, provided ongoing support throughout all stages of the project, from engineering and logistics to installation and commissioning, ensuring that the customer was well-guided and supported throughout the entire process.

Opting for Pexgol’s solution not only provided a system resistant to the corrosive effects of hard water and salty soil, but also a solution with a longer life span and fewer interferences within the plant, due to the flexibility and durability of Pexgol pipes. This successful replacement has set a new standard for Profertil’s operations, highlighting the effectiveness of Pexgol’s innovative approach to corrosion-resistant pipe systems.

Related Case Studies

Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018
How Pexgol piping improved the fire network system infrastructure in a paint manufacturing plant.

Pexgol Piping for Fire Network System Expansion

Wall
Argentina

 | 

2023
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Slurry transportation with high nickel levels

Leached Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2013