Meltdown Water Transport
Pipe installation on a mountain
Case Study Nº
16
Customer
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Working Conditions
Complex & harsh ground, 300 m altitude.
Pexgol Pipes
Pexgol 315 mm, Class 15 (SDR 11).
Application
Water transportation.
Lenght
3,300 m.
Categories

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Related Case Studies
Transport of Compressed Air for Underground Mine
HMC Gold
Chile
|
2021
Efficiency and Durability in Handling Muddy Water
Industrial Aceitera del Casanare
Colombia
|
2023
From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool
Gordon Pool
Israel
|
2023
High-pressure fluid transport
Minera Antapaccay
Peru
|
2023