Meltdown Water Transport
Pipe installation on a mountain
Case Study Nº
16
Customer
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Working Conditions
Complex & harsh ground, 300 m altitude.
Pexgol Pipes
Pexgol 315 mm, Class 15 (SDR 11).
Application
Water transportation.
Lenght
3,300 m.
Categories

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Related Case Studies
Palm Oil: Transport of Leached Mud
Industria Chiquibul
Guatemala
|
2018
Drainage Lines in Underground Mine
Lundin Mining – Candelaria Norte Mine
Chile
|
2020
Efficient Implementation of NaOH Drainage Systems
Pluspetrol
Argentina
|
2023