Meltdown Water Transport
Pipe installation on a mountain
Estudo de Caso Nº
16
Cliente
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Condições de Trabalho
Complex & harsh ground, 300 m altitude.
Solução Pexgol
Pexgol 315 mm, Class 15 (SDR 11).
Aplicação
Water transportation.
Comprimento
3,300 m.
Categorias

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Estudos de Caso Relacionados
A Flexible Solution for Formation Water UnderDemanding Conditions
Pluspetrol
Argentina
|
2026
Hot Water Distribution for Solar Technology
Raygen
Australia
|
2021
Implementation of Pexgol Pipelines for the Transport of Muddy Water
IACSA
Colombia
|
2023
2,900 Meters of Pexgol Installed and Pressure-Tested in Just 3 Days
Petróleos Sudamericanos
Argentina
|
2026
Overcoming Corrosion Challenges in the Oil Industry
Petróleos Sudamericanos
Argentina
|
2023