Mining Drainage Lines

Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Case Study Nº

72

Customer

Lundin Mining – Alcaparosa Mine
Chile

|

2019

Working Conditions

Underground work

Pexgol Pipes

Pexgol 160 mm (6”), class 19

Application

Dewatering

Lenght

1000 m / 3280 ft

Categories

Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

The Challenge

Lundin Mining at Alcaparosa Mine had to install a drainage line for its underground mine, where the main problem they faced was lack of time. They needed a non-invasive installation of the pipeline in order to allow the continuity of the mining operation and get back to work in the shortest time possible.

Pexgol Solution

The client decided to install 1000 meters of Pexgol pipe that was supplied in two coils of 500 meters each.
Cross-linked polyethylene was chosen because of:

  • Its long-length supply format.
  • Ease of installation, thanks to the flexibility of the pipe that was easy to accommodate in the curves of the interior of the mine.
  • Short installation time to avoid stopping the mining operation.

Installation was quick and easy, uncoiling the full length of the pipeline and then dragging it into the mine.

Related Case Studies

Optimization of Water Systems in the Energy Industry.

“Threading” Pexgol Pipes

Pluspetrol
Argentina

 | 

2023
Test Installation for Transporting Silica Sand.

Transport of Silica Arena: HDPE vs Pexgol

Covia Corp
Mexico

 | 

2019
Replacement of a HDPE Pipe for a Pexgol Pipe

Slurry Transportation

Sabinas Mine
Mexico

 | 

2017
Replacement of a HDPE Pipe for a Pexgol Pipe

Compressed Air Transportation

Saucito S.A. de C.V. Mine
Mexico

 | 

2017
Groundwater Transportation With Ph Low Levels

Groundwater Transportation

Grupo México, Buena Vista del Cobre Mine
Mexico

 | 

2015
Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012