Meltdown Water Transport
Pipe installation on a mountain
Case Study Nº
16
Customer
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Working Conditions
Complex & harsh ground, 300 m altitude.
Pexgol Pipes
Pexgol 315 mm, Class 15 (SDR 11).
Application
Water transportation.
Lenght
3,300 m.
Categories

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Related Case Studies
Vertical Dewatering
Ferrexpo Poltava Mining
Ukraine
|
2019
Alumina Plant: Ore Slurry Transportation
Urals Alumina Plant – Rusal
Russia
|
2013
Improving efficiency in steel foundry with Pexgol
KSB de Mexico
Mexico
|
2023
Transportation of Alcohol for the Production of Rum and Brandy
Cuba Ron
Cuba
|
2016
Dewatering Through Shafts
Esan Eczacibasi Endustriyel Hammaddeler
Turkey
|
2019