Working Conditions
Pressure 189 psi; height difference 130 m; solids 15-20 %; fluid temperature 20-25°C.
Pexgol Pipes
Pexgol Class 15 160 x 14.6.
Application
Dewatering
Lenght
650 meters.
Categories

The Challenge
El Volcan Mine was facing a excess water that required dewatering. During rainy season the Mine area suffers from constant floods due to high level groundwater that wasn’t taken under consideration.
In addition, the client was looking for a quick and easy to install solution, since the pipe was going to be suspended, and a regular pipe will require supports.
Pexgol Solution
El Volcan Mine decided to replace their current 6” RD11 HDPE pipe for a Pexgol class 15 pipe 160 x 14.6 due to it quick and easy installation.
650 meters of Pexgol pipe was provided. The installation was done in a quick and efficient way, and count with Pexgol technical support during the whole process.
Related Case Studies
Replacement of Corroded Pipeline in Oil &Gas: Pexgol Solution in Argentina
Petróleos Sudamericanos
Argentina
|
2025
Water Supply & Fire Extinguisher Line
Cheddi Jagan International Airport
Guyana
|
2018
Transporting Brine at High Pressure
Mekorot
Israel
|
2020
Comprehensive Redesign of the PumpingSystem with Pexgol at the Sossego Mine
Vale
Brazil
|
2024