Slurry Transportation

Transport of acid slurry at high temperatures

Case Study Nº

12

Customer

Moa Nickel S.A. Sherritt
Cuba

|

2012

Working Conditions

Highly abrasive liquid at 80°C.

Pexgol Pipes

Pexgol 335 mm, Class 10.

Application

Discharge line.

Lenght

350 m.

Categories

Slurry Transportation

The Challenge

Moa Nickel required to transport highly abrasive liquid at high temperatures.

At the beginning they used fibre-reinforced plastic pipes, that later suffered damage caused by the abrasion. Furthermore, they used polypropylene pipes that didn’t work either, they couldn’t resist neither the abrasion nor the high temperatures.

The former pipes were short combined sections that required reinforced foundations and were very hard to install. The working periods were short because of the constant failures, furthermore, the maintenance cost was high as well.

Pexgol Solution

Once the client evaluated the operative conditions, they decided that Pexgol pipes were the best option, thanks to it abrasion resistance.

Additionally, special “U” pieces were developed for the client, made of steel with internal Pex lined.

After the installation, the Pexgol pipes operates perfectly till today, in excellent conditions and reducing head losses.

Related Case Studies

Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
Slurry transportation with high nickel levels

Leached Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2013
Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

High Corrosion Resistance Against Brine

Unipar Carbocloro
Brazil

 | 

2019
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019