Slurry Transportation

Transport of acid slurry at high temperatures

Case Study Nº

12

Customer

Moa Nickel S.A. Sherritt
Cuba

|

2012

Working Conditions

Highly abrasive liquid at 80°C.

Pexgol Pipes

Pexgol 335 mm, Class 10.

Application

Discharge line.

Lenght

350 m.

Categories

Slurry Transportation

The Challenge

Moa Nickel required to transport highly abrasive liquid at high temperatures.

At the beginning they used fibre-reinforced plastic pipes, that later suffered damage caused by the abrasion. Furthermore, they used polypropylene pipes that didn’t work either, they couldn’t resist neither the abrasion nor the high temperatures.

The former pipes were short combined sections that required reinforced foundations and were very hard to install. The working periods were short because of the constant failures, furthermore, the maintenance cost was high as well.

Pexgol Solution

Once the client evaluated the operative conditions, they decided that Pexgol pipes were the best option, thanks to it abrasion resistance.

Additionally, special “U” pieces were developed for the client, made of steel with internal Pex lined.

After the installation, the Pexgol pipes operates perfectly till today, in excellent conditions and reducing head losses.

Related Case Studies

Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
Vertical Mobile Pexgol Installation on the Rocks for Mine Dewatering.

Mine Dewatering at Low Temperature

Ferrexpo Yeristovo Mining
Ukraine

 | 

2019
Transforming water transportation with Pexgol technology

Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Comisión Federal de Electricidad
Mexico

 | 

2023
Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Greater Efficiency and Safety in Leaching with Pexgol Pipes

Barrick Gold Corp.
Argentina

 | 

2025
Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012