Transport of Muddy Water for Palm Oil Extractor

Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Case Study Nº

121

Customer

Extractora Poligrow
Colombia

|

2022

Working Conditions

Flow rate: 176 PSI | Temperature: 80°C / 176°F

Pexgol Pipes

Pexgol 110 mm (4″), Class 15

Application

Transport of Muddy Water

Lenght

550 m / 1084 ft

Categories

Transport of Muddy Water for Palm Oil Extractor

The Challenge

Poligrow Colombia is a company dedicated to the development of agro-industrial projects, focused on palm oil extraction.

Poligrow needed a new transport line for muddy water to the oxidation lagoons. For this purpose, excavation and installation of the piping was carried out in the palm crop, without causing damage to the plants or irrigation piping. The route of the piping extended from Florentino, passing through the main road and the plantation

Pexgol Solution

Poligrow opted to use Pexgol’s PE-X piping for the transport of muddy water. The choice of Pexgol was crucial to finish the project quickly and efficiently.

Pexgol was chosen for several reasons: firstly, the installation was quick and simple, which saved time and costs. Additionally, the use of PE-X piping reduced the number of necessary joints, further simplifying the installation.

Another advantage was the supply in a 550-meter roll, which minimized the need for additional cuts and joints. The installation of the 550 meters of piping was carried out in a record time of 7 hours, thanks to the efficiency and simplicity of the process.

To carry out the installation, two GP mechanical joints were used, and support was provided by a CAT 312 backhoe, a Benitin vibrocompactor, and a ratchet. In addition, the technical team responsible for the installation consisted of one officer and one assistant.

In summary, the choice of Pexgol and its PE-X piping for the transport of muddy water in the palm oil processing plant was a wise decision, as it allowed the project to be completed quickly, efficiently, and with minimal interruptions.

Related Case Studies

Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993
Hot sylvinite leach at 114°C/237°F

Mineral Processing – Potash Processing Plant

ICL group, Dead Sea Works
Israel

 | 

1987
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010
Pvc Pipe Replacement by Pexgol

Transportation of sodium sulfide

Magnelec S.A. de C.V.
Mexico

 | 

2018
Mining Effluent Transportation in Cuba.

Pexgol Optimizes Tailings Management at Sherritt’s Moa Nickel Mine

Sherritt
Cuba

 | 

2020