Installation of Water Well in Reduced Space

Installation of a Borehole with Pipe in Sections for Reduced Space.

Case Study Nº

95

Customer

Mekorot
Israel

|

2020

Working Conditions

Pressure: 10 bar

Pexgol Pipes

Pexgol 200 mm (6”), class 24

Application

Borehole for treated effluent water

Lenght

70 m

Categories

Installation of a Borehole with Pipe in Sections for Reduced Space.

The Challenge

Mekorot, the national company in charge of water supply in Israel, among other activities, has installed and used Pexgol pipes for water wells for more than 30 years.

The wells were always installed using one of Pexgol’s great advantages, which is the possibility of supplying the pipes in coils of long lengths.

For this project in particular, the well had to be installed in a central area of the city and therefore there was not enough space to carry out the coil deployment. The pipe needed to transport treated effluent water.

Pexgol Solution

Together with the Engineering Department of Golan Plastic Products, low cost accessories were developed in order to be able to install the pipes in 12 meter lengths and thus occupy as little space as possible on public roads for installation.

The accessories consisted of a stainless steel “insert” and our Double Connector made of galvanized iron coated on the outside with anti-corrosive paint. Although long sections were not supplied, the fact of installing Pexgol pipe guarantees a long lifespan, which could not be achieved if it was done with conventional steel pipes.

The installation was a success and only took one working day, to make the connections the team did not require special tools or previous training.

Related Case Studies

Pexgol’s Piping Solution for Regal Petroleum.

Overcoming Piping Challenges in Hydrocarbon Transportation

Regal Petroleum Corporation
Ukraine

 | 

2023
Transport Of Lime Slurry At 100°C

Transport of Lime Slurry

Minas de Oro Nacional, Mulatos Mine
Mexico

 | 

2015
Water line feed from wells to mine

Water Lines – High Pressure Water Feed Lines

Yamana Gold, Meridian Mine
Chile

 | 

2012
Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

Transportation of Water with Solids

Kofanor
Mexico

 | 

2022
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Química del Rey replaced a corroded steel column with a Pexgol line, achieving a faster, safer, and more durable installation.

Reliable Solution for Deep Wells in Corrosive Environments

Química del Rey
Mexico

 | 

2022