Transport of Silica Arena: HDPE vs Pexgol

Test Installation for Transporting Silica Sand.

Case Study Nº

90

Customer

Covia Corp
Mexico

|

2019

Working Conditions

Pneumatic transport at 6 bar

Pexgol Pipes

Pexgol Elbow 90° 225 mm (8”), Class 15 | Pexgol Flange Coupler 225 mm (8”)

Application

Transport of Silica Arena

Lenght

Categories

Test Installation for Transporting Silica Sand.

The Challenge

Covia Corp, a leading company in the manufacture and sale of industrial minerals in Mexico, required to pneumatic transport silica sand at 6 bar (with 50% solids). Initially they worked with 225mm (8”) HDPE pipes that suffered from high levels of wear at the elbows due to abrasion of the material it was carrying.

Pexgol Solution

The client decided to replace one of the HDPE elbows with a Pexgol 90° 225 mm (8”) class 15 and test it for 3 months.
HDPE elbows generally lasted up to a month and a half of work. The Pexgol elbow had to at least double the operating time to pass the test.

After 3 months of testing it was shown that Pexgol exceeded expectations. It’s been more than a year and the elbows continue to function without problems.

Only torque wrenches were used for the installation.

Related Case Studies

A high-precision maneuver enabled the complete assembly of the system in record time, ensuring safety and operational continuity.

Pexgol Overcomes Extreme Dewatering Conditions in La Ciénega

Fresnillo Plc.
Mexico

 | 

2025
Replacing Steel for PE-X Pipes to Transported Processed Water.

Replacement of Steel Pipes for PE-X

Rosebel Gold Mines – IamGold
Suriname

 | 

2020
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Profertil and the Adaptation to New Chemical Processes with Pexgol.

Efficient Implementation of NaOH Drainage Systems

Pluspetrol
Argentina

 | 

2023
Cement Slurry Injection to an Underground Mine

Backfill

Aguilar Mine
Argentina

 | 

2015