Water Transport in Copper Mine

Work with High Pressures and Extreme Ambient Temperature

Case Study Nº

68

Customer

Zaldivar SPA Mine
Chile

|

2018

Working Conditions

Pressure: 24 & 30 bar | Ambient temperature: 5° to 28°C / 41° to 82°F

Pexgol Pipes

Pexgol 160 mm (6”), Class 15 | Pexgol 160 mm (6”), Class 19 | Pexgol 160 mm (6”), Class 24 | Pexgol 160 mm (6”), Class 30

Application

Water transport

Lenght

9500 m

Categories

Work with High Pressures and Extreme Ambient Temperature

The Challenge

The mining company Zaldivar SPA (Barrick) needed to implement a line of drinking water from the storage pond to the camp sector, crossing the entire mining site. Two thirds of the layout required a pressure of 24 and 30 bar, using the minimum amount of joints possible and in the shortest time conceivable.

Pexgol Solution

It was decided to install 9500 m of Pexgol pipe due to its advantages:

  • High pressure resistance (24 and 30 bar)
  • Supply in long lengths (sections of up to 600 meters) minimizing assembly time and number of joints.
  • Resistance to mechanical stresses due to pipe dragging in hard to reach areas.

The installation was simple, fast and safe. Without resources or special tools, shortening the known assembly program with HDPE pipes.

Related Case Studies

In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Pexgol: Delivering Rapid, Reliable & Long-lasting Mining Drainage Solutions

Addressing Drainage Challenges with Pexgol

Avino Mine
Mexico

 | 

2023
Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017
Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010