Skip to content

Water Transport in Copper Mine

Work with High Pressures and Extreme Ambient Temperature

Case Study Nº

68

Customer

Zaldivar SPA Mine
Chile

|

2018

Working Conditions

Pressure: 24 & 30 bar | Ambient temperature: 5° to 28°C / 41° to 82°F

Pexgol Pipes

Pexgol 160 mm (6”), Class 15 | Pexgol 160 mm (6”), Class 19 | Pexgol 160 mm (6”), Class 24 | Pexgol 160 mm (6”), Class 30

Application

Water transport

Lenght

9500 m

Categories

Work with High Pressures and Extreme Ambient Temperature

The Challenge

The mining company Zaldivar SPA (Barrick) needed to implement a line of drinking water from the storage pond to the camp sector, crossing the entire mining site. Two thirds of the layout required a pressure of 24 and 30 bar, using the minimum amount of joints possible and in the shortest time conceivable.

Pexgol Solution

It was decided to install 9500 m of Pexgol pipe due to its advantages:

  • High pressure resistance (24 and 30 bar)
  • Supply in long lengths (sections of up to 600 meters) minimizing assembly time and number of joints.
  • Resistance to mechanical stresses due to pipe dragging in hard to reach areas.

The installation was simple, fast and safe. Without resources or special tools, shortening the known assembly program with HDPE pipes.

Related Case Studies

Cement Slurry Injection to an Underground Mine

Backfill

Aguilar Mine
Argentina

 | 

2015
Changing carbon steel for efficiency: Pexgol PE-X pipes in Aconcagua Energía

Elevating Efficiency in Hydrocarbon Exploitation

Aconcagua Energía
Argentina

 | 

2023
Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Transport of Muddy Water for Palm Oil Extractor

Extractora Poligrow
Colombia

 | 

2022
Pexgol: Delivering Rapid, Reliable & Long-lasting Mining Drainage Solutions

Addressing Drainage Challenges with Pexgol

Avino Mine
Mexico

 | 

2023
Replacing HDPE pipes with Pexgol allowed Vale to simplify operations, eliminate auxiliary equipment, and achieve a permanent installation under extreme conditions.

Comprehensive Redesign of the PumpingSystem with Pexgol at the Sossego Mine

Vale
Brazil

 | 

2024
Moving from PVC to Pexgol: Ensuring Efficiency in Lithium Production

Optimization of Lithium Brine Transportation

Puna Mining
Argentina

 | 

2022