Dewatering Through Shafts

Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

Case Study Nº

81

Customer

Esan Eczacibasi Endustriyel Hammaddeler
Turkey

|

2019

Working Conditions

Pressure: 20 bars | Ambient temperature

Pexgol Pipes

Pexgol 160 mm (6”), class 24

Application

Dewatering

Lenght

350 m / 1148.29 ft

Categories

Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

The Challenge

Esan had to pump dirty water from -600 meters at their underground lead-zinc mine, through narrow shafts to upper levels of the mine.

They usually used HDPE and steel pipes but they had clogging problems. This time Esan wanted a pipe that will not clog and will be very easy to install, with no need of fittings installed in the narrow shafts. They tried to find alternatives to prevent leakege problems on the fittings that caused to change them many times.

Pexgol Solution

The client decided to install 350 meters of Pexgol pipe. They choose Pexgol due to it’s experience with providing long pipe sections that enable to avoid installing fittings in narrow shafts and because of the resistance of the pipe to scale build up.

Thanks to Pexgol the installation took just 6 hours, Esan reduced their operation downtime.

Esan built their own decoiler and decoiled the pipe by themselves.

Related Case Studies

Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Installation of a drainage system between a well and a mining dam.

Drinking Water on Sloping Terrain

AquaMag
Colombia

 | 

2019

Categories:

Enhancing Efficiency and Durability in the Construction of Aerial Pipelines.

Facing the Challenges of the Neuquén Terrain in Argentina

Pluspetrol
Argentina

 | 

2023
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Pexgol Pipe Installation for Open Pit Mine Drainage.

Efficient Open Pit Mine Drainage

BHP Escondida Mine
Chile

 | 

2022
Transport of Leached Mud from the Treatment Plant to an Oxidation Lagoon

Palm Oil: Transport of Leached Mud

Industria Chiquibul
Guatemala

 | 

2018