The Challenge

Esan had to pump dirty water from -600 meters at their underground lead-zinc mine, through narrow shafts to upper levels of the mine.

They usually used HDPE and steel pipes but they had clogging problems. This time Esan wanted a pipe that will not clog and will be very easy to install, with no need of fittings installed in the narrow shafts. They tried to find alternatives to prevent leakege problems on the fittings that caused to change them many times.

Pexgol Solution

The client decided to install 350 meters of Pexgol pipe. They choose Pexgol due to it’s experience with providing long pipe sections that enable to avoid installing fittings in narrow shafts and because of the resistance of the pipe to scale build up.

Thanks to Pexgol the installation took just 6 hours, Esan reduced their operation downtime.

Esan built their own decoiler and decoiled the pipe by themselves.

Related Case Studies

Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

High Corrosion Resistance Against Brine

Unipar Carbocloro
Brazil

 | 

2019
Installation of Pexgol pipes for the transport of formation water (gas and minerals)

Gas Wells: Formation Water Treatment

Canacol
Colombia

 | 

2018
Replacement of Carbon Steel Pipes with Pexgol for the Transportation of Natural Gas.

Natural Gas Transportation with Pexgol

YPF
Argentina

 | 

2022
Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019
Replacing steel pipes suffering from sediment formation

Transportation of Ore Slurry

RUSAL, aluminum factory
Russia

 | 

2012
Installation of Pexgol Pipe for a Intake Line to Transport Hot Abrasive Brine Slurries

Hot & Abrasive Potash Brine Processing

Fertilizer Company
Canada

 | 

2017