Sewage Water Transportation

Sewage Water Transportation with 300 PPM Hydrogen Peroxide

Caso de Estudio Nº

47

Cliente

BorsodChem
Hungary

|

2011

Condiciones Operativas:

Extreme corrosion

Tuberías Utilizadas:

Pexgol 200 mm Pexgol. Prefabricated Elbows 200 mm

Uso:

Sewage Transportation

Largo:

n/a

Categorías:

The Challenge

BorsodChem requiered to transport sewage water with 300 ppm hydrogen peroxide for a medium of manufacturing procedure of
car-spareparts. The client has tested di erent pipe material such as HDPE, steel and ductile cast iron (both with and without lining), but none of this materials could withstand the corrosion.

Pexgol Solution

The client decided to install a Pexgol pipe 200 mm. The installation was conducted with Plasson HDPE electrofusion technology combined
with butt fusion preparing tools (the butt surfaces of pipes were made plain / the blocking elements of EF couplers were removed – this way the aggresive media could not reach the internal surface of the EF couplers).

The pipe is still working till today withstanding the high corrosive conditions.

Casos de Estudio Relacionados

Instalación de tuberías Pexgol para el drenaje de una mina subterránea

Desagüe Vertical en Mina Subterránea

Mina Meridian - Faena El Peñón
Chile

 | 

2018
Reemplazo de Tubería de PVC por Pexgol

Transporte de Sulfuro de Sodio

Magnelec S.A. de C.V.
México

 | 

2018
Transporte de Lodo Lixiviado desde la Planta de Tratamiento a una Laguna de Oxidación

Aceite de Palma: Transporte de Lodo Lixiviado

Industria Chiquibul
Guatemala

 | 

2018
Transporte de Pulpas Ácidas de Alta Temperaturas Lixiviadas

Transporte de Pulpas

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Reemplazo de una Línea de Drenaje en una Mina Subterránea.

Drenaje en Mina Subterránea

Atacama Kozan
Chile

 | 

2019
Transporte de Agua en más de 150 Cruces de Caminos Mineros

Transporte de Agua en Cruces de Caminos

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012