Pexgol and Fresnillo: Allies in innovative piping solutions for mining.

Case Study Nº

153

Customer

Minera Fresnillo
Mexico

|

2021

Working Conditions

Pressure: 130 psi (pump pressure) | Temperature: Ambient 35°C / 95°F | Fluid: Slurry (tailings), concentration 55%

Pexgol Pipes

Pexgol 280 mm (12″), SDR 11

Application

Tailings transportation

Lenght

4800 m / 15748 ft

Categories

Safety and durability: The heart of our solutions

The Challenge

Fresnillo, a leader in silver and gold production in Mexico, faced significant issues with its existing HDPE pipeline in its mining unit. Frequent failures in mechanical joints, including detachments of stub ends, failures in thermal fusions and flanges, created a potential risk of tailings spills, raising concerns for safety and environmental impact.

Pexgol Solution

Pexgol addressed this challenge with its scientifically proven and abrasion-resistant PE-X pipes, being up to four times more resistant than HDPE.

The electrofusion joints in Pexgol pipes ensured double safety, significantly reducing the risk of leaks. The installation was remarkably efficient, with each 120-meter roll laid out in just 20 minutes, allowing for rapid progress without compromising safety or quality.

A crucial aspect of Pexgol’s service was the comprehensive training provided to Fresnillo mine staff. This training ensured that the personnel were skilled in handling and installing Pexgol pipes, particularly mastering the electrofusion process. This skill development initiative not only facilitated smoother installations but also empowered the mine team with the knowledge and confidence to maintain pipeline integrity, reflecting Pexgol’s commitment to excellence and collaboration in every project.

Related Case Studies

Монтаж дренажной системы между скважиной и рудничной дамбой.

Дренирование скважины возле рудничной дамбы

CODELCO — Рудник Эль-Тениенте
Чили

 | 

2019
Трубы Pexgol для транспортировки сточных вод при температуре 30 °C / 86 °F в подземном руднике.

Перекачка сточных вод от горных работ

AngloGold Ashanti
Бразилия

 | 

2019
Установка труб на горе

Транспортировка талых стоков

Компания Codelco Andina, проект TADA 1-2
Чили

 | 

2013
Осушение шахты в условиях высокого давления

Осушение шахты — в условиях высокого давления

Antofagasta Minerals, шахта «Михилья»
Чили

 | 

2011
Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Greater Efficiency and Safety in Leaching with Pexgol Pipes

Barrick Gold Corp.
Argentina

 | 

2025
Оптимизация дренажа шахт и транспортировки воды с помощью труб Pexgol на руднике Cerro Negro.

Преодоление препятствий при установке и повышение операционной эффективности

Newmont
Аргентина

 | 

2022