Biodiesel Transport

Biodiesel Transport through the Colombian Jungle

Case Study Nº

56

Customer

Indupalma (Oro Rojo Plant)
Colombia

|

2012

Working Conditions

Temperature: Fluid at 95°C Pressure: 10 bar

Pexgol Pipes

Pexgol 160 mm (6”), Class 24

Application

Biodiesel Transport

Lenght

450 m

Categories

Biodiesel Transport through the Colombian Jungle

The Challenge

Indupalma is a company that produces palm oil and its derivatives. One of the most common uses of palm oil is for the production of biodiesel. Initially, Indupalma used asbestos pipes for transporting biodiesel, which were later replaced by CPCV SCH 80 pipes. Neither of these materials was resistant to abrasion and the high temperatures of the fluid. Moreover, due to the jungle terrain (where there are constant rains and landslides), these pipes often broke completely due to the movement of rocks and trees. This situation caused losses for the company, not only due to production stoppages and the constant need to replace the pipes, but also because of spills that had environmental consequences.

The Solution

After witnessing the poor performance of these pipe materials, Indupalma decided to look for a new pipe material that could withstand impact, chemical resistance, and high temperatures to transport the fluid. They ultimately chose Pexgol pipes, which met all these requirements.

Related Case Studies

Транспортировка речной воды по пересеченной местности.

Транспортировка воды по пересеченной местности

Southern Copper Corporation
Перу

 | 

2019
Trial Demonstrates Superior Wear Resistance in Sea Water + Ash Slurry Conditions.

Unmatched Durability in Harsh Slurry: Pexgol Outperforms Steel

Tata Power
India

 | 

2023
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010
Enhanced hydraulic and structural reliability for critical community infrastructure.

Optimization of Potable Water Supply for 1,600 residents

Rincón de la Candelaria
Mexico

 | 

2025
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Транспортировка грязной воды (жидкие отходы производства пальмового масла) с высоким содержанием органических веществ.

Транспортировка грязной воды на заводе по переработке пальмового масла

La Gloria
Колумбия

 | 

2020