Skip to content

2,900 Meters of Pexgol Installed and Pressure-Tested in Just 3 Days

Pexgol reduced the number of joints, accelerated installation, and improved network reliability.

Case Study Nº

195

Customer

Petróleos Sudamericanos
Argentina

|

2026

Working Conditions

Operating pressure: 6 kg/cm² / 85 psi | Temperature: 30°C / 86°F | Flow rate: 40,000 m³/day | Transported material: Treated methane gas, 100% dry

Pexgol Pipes

Pexgol 110 mm, Class 10

Application

Dry gas / treated methane transportation

Lenght

2,900 m / 9,514 ft

Categories

2,900 Meters of Pexgol Installed and Pressure-Tested in Just 3 Days

The Challenge

Petróleos Sudamericanos S.A., an energy company with more than 30 years of experience in oil and gas exploration and production, needed to replace an existing dry gas transportation pipeline in Catriel, Río Negro, Argentina.

The previous carbon steel pipeline had been in service for many years and was showing signs of corrosion and wear. To ensure operational continuity and improve system reliability, the client required an alternative capable of transporting treated methane gas, 100% dry, under operating conditions of 6 kg/cm² pressure, a temperature of 30°C / 86°F, and a flow rate of 40,000 m³/day.

In addition to material resistance, the project required an efficient installation process with fewer joints and shorter field execution times.

The Solution

For this project, 2,900 m / 9,514 ft of 110 mm, Class 10 Pexgol pipe were installed for dry gas transportation.

Thanks to its flexibility, low weight, and availability in long sections, Pexgol made it possible to complete the installation and pneumatic pressure test in just three days. Only six joints were required along the entire 2.9 km / 1.8 mi pipeline, significantly reducing critical points and improving network safety.

Pexgol’s corrosion resistance, ease of handling, and long service life made it an ideal solution for replacing the existing metallic pipeline.

This was the contractor’s second project using Pexgol. After gaining experience with the material during the first installation, the contractor selected Pexgol again due to its ease of installation and operational advantages over traditional piping solutions.

Related Case Studies

Горячий сильвинитовый насыщенный рассол с температурой 114 °C (237 °F)

Переработка минерального сырья — установка по переработке углекислого калия

ICL group, работы на Мертвом море
Израиль

 | 

1987
Транспортировка пульпы пальмового масла при 95 °C.

Транспортировка пульпы пальмового масла

Компания Loma Fresca
Колумбия

 | 

2017
Сравнительные испытания транспортировки рассола с использованием труб из ПЭВП и Pexgol.

Сравнение вариантов для транспортировки рассола

Albemarle Salar
Чили

 | 

2020
Flexible installation, fast deployment and long service life for a mining project with over 300 m of elevation difference

Pexgol Ensures Reliable Operation in High- Demand Hydraulic Systems

Endeavour Silver
Mexico

 | 

2024
Откачка воды с низким уровнем pH

Откачка воды из карьера

Шахта компании Arcelor Mittal
Мексика

 | 

2016
Trial Demonstrates Superior Wear Resistance in Sea Water + Ash Slurry Conditions.

Unmatched Durability in Harsh Slurry: Pexgol Outperforms Steel

Tata Power
India

 | 

2023