Skip to content

Durable Solution Against Abrasion in Production Facilities: Pexgol at YPF

Performance evaluation of Pexgol lining under extreme service conditions.

Case Study Nº

175

Customer

YPF
Argentina

|

2018

Working Conditions

Temperature: 75°C / 167°F | Pressure: 8 kg/cm² | Fluid components: Hydrocarbons and produced water from wells (with sand presence)

Pexgol Pipes

Pex-lined elbow

Application

Pex-lined reducing elbow in oil production facility – Abrasion

Lenght

N/A

Categories

Durable Solution Against Abrasion in Production Facilities: Pexgol at YPF

The Challenge

YPF, Argentina’s leading oil and gas exploration and production company, was facing recurring failures in various components of the Aguada Toledo 3 Production Facility (Bat-AT3), particularly in the pump discharge circuit.
The failures were identified in flow restriction areas such as pump discharge reducers, flow control valves, and orifice plates. These components were internally coated with epoxy layers ranging from 250 to 650 µm in thickness.

YPF’s internal studies identified two main deterioration mechanisms:

  • Flow-assisted corrosion, considered the most likely cause.
  • Localized corrosion due to occluded cells, caused by partial detachment of the internal epoxy lining.

Material loss was estimated at 7 to 9 mm of wall thickness per year under continuous operation, with damage concentrated in reducers and elbows. Considering that the 6” circuit and the 6” to 3” reducing elbow had a wall thickness of 7.11 mm (SCH 40 steel pipe), these failures posed a serious risk to system safety and operational continuity.

The Solution

To mitigate the issue, YPF proposed testing a carbon steel component internally lined with Pexgol to assess its performance under real operating conditions. A 6” x 3” reducing elbow connected to the discharge of one of the pumps was selected for this trial.

The component was manufactured and inspected at Golan’s facility, where the internal Pexgol lining was applied. Once installed and put into operation, the elbow remained in service for 7 years without damage, despite the severe operating conditions.

The implementation of the Pexgol lining proved to be a highly effective solution, eliminating previous failures and significantly extending the system’s service life—without costly maintenance or unplanned shutdowns. This case reinforces Pexgol’s reliability in critical applications where corrosion and abrasion are ongoing challenges.

Related Case Studies

Работа с высоким давлением и предельными температурами окружающей среды

Транспортировка воды на медном руднике

Рудник Zaldivar SPA
Чили

 | 

2018
Транспортировка питьевой воды по пересеченной местности.

Водопровод питьевой воды

Acueducto y Alcantarillado de Bogotá
Колумбия

 | 

2019
Installation of a drainage system between a well and a mining dam.

Drinking Water on Sloping Terrain

AquaMag
Colombia

 | 

2019
Reducing maintenance and increasing safety in hydraulic backfill operations.

Pexgol Simplifies Slurry Transportation at Buriticá Mine

Zijin - Continental Gold
Colombia

 | 

2023
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022
Отвод воды из шахты

Отвод воды из шахты

Компания El Peñón Yamana Gold, шахта Meridian
Чили

 | 

2016