Evolving Mine Operations with Pexgol Piping

The Robust & Flexible Answer to Constantly Changing Mine Surfaces.

Case Study Nº

150

Customer

Peña Colorada
Mexico

|

2023

Working Conditions

Temperature: Ambient Flow: 410 m^3/h | Pressure: 7 bar | Fluid components: Rainwater Pipe exposed to the sun

Pexgol Pipes

Pexgol 10″, SDR 11

Application

Mine Dewatering

Lenght

500 m / 1640 ft

Categories

Evolving Mine Operations with Pexgol Piping

The Challenge

Peña Colorada, a leading company dedicated to the exploration, exploitation, and beneficiation of iron ore, met with a unique operational hurdle at their open-pit mine in Mexico. Historically, they employed HDPE piping systems for mine drainage.

However, as the mine’s surface continuously evolved, they faced the challenge of constantly relocating their pumps and piping. Each relocation with their steel pipes required a significant workforce, two cranes, and a special transportation mechanism for the pipe. Furthermore, they had to ensure very broad curves to prevent leakage at the joints.

Pexgol Solution

Pexgol, recognizing the inherent challenges with the existing piping system, introduced their 10” SDR 11 pipes. These were designed not only to address the drainage needs but to offer unmatched flexibility in a mining environment where surfaces change frequently. The Pexgol pipes could be easily dragged for relocation across the mine’s floor without compromising operational pressures. Moreover, these pipes could effortlessly follow any path necessary for optimal drainage.

During installation, as the pipe was being unrolled, it was simultaneously positioned where it was to be installed, connecting the pump to the discharge pipe. The entire process was completed in a single shift without any special surface preparation. The mine, which notably produces steel and even manufactures steel pipes, chose Pexgol due to its superior corrosion resistance and installation flexibility.

Related Case Studies

Монтаж дренажной системы между дамбами на медном руднике.

Транспортировка воды между дамбами

CODELCO — Рудник Эль-Тениенте
Чили

 | 

2019
Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

Pexgol’s Pipe Solution Enhances Salmon Farming

Mowi
Chile

 | 

2021
Вертикальный нефиксированный монтаж труб Pexgol на камнях для осушения шахты.

Осушение шахты при низкой температуре

Еристовский ГОК, Ferrexpo
Украина

 | 

2019
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Добыча подземной воды из скважин

Добыча подземных вод

Компания Doña Inés de Collahuasi SCM, шахта Collahuasi
Чили

 | 

2010
Транспортировка щелочи в цехе каустика и регенерации

Целлюлозно-бумажный комбинат

Светлогорский комбинат
Россия

 | 

2015