Pexgol: Significant Pipe Wall Scale Reduction

The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Case Study Nº

137

Customer

Copper Mine
USA

|

2022

Working Conditions

Temperature: Ambient | Flow: 60 gpm — 6ft/s | Pressure: 20 psi

Pexgol Pipes

Application

Pilot Study: Scaling performance comparison between same sized Pexgol & HDPE pipes

Lenght

304 m / 1,000 ft

Categories

The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Introduction

A prominent copper mine in Arizona that uses an in-situ copper ore recovery process, experienced scaling issues in the existing HDPE (PE 4710) piping deployed in the rinse cycle phase of ore extraction.
Scaling in the HDPE pipes caused clogging and despite the use of scale inhibitors and cleaning, some pipes were still being replaced too frequently.

The Problem

Increased operational maintenance and reduced efficiency of the HDPE pipes
created the need for a more efficient, long-term solution.

Pexgol Solution

Pexgol was proposed as the solution for reduced scaling.
A controlled pilot study was commissioned by the mine to compare gypsum slurry pumped through Pexgol vs HDPE (PE 4710) for a period of 4 weeks.
Various flow velocities, pressures and ambient temperatures were monitored and compared after 2 and 4 weeks.

Results

The Pexgol pipes showed almost no scaling compared with the scaled HDPE pipes after 2 and 4 weeks.
It was recommended that Pexgol replace HDPE at the rinse cycle phase of ore extraction of the mine.

Conclusion

Pexgol pipes are a viable solution for similar slurry applications.

Related Case Studies

Potable Water Supply on Harsh Terrain

Снабжение питьевой водой в труднопроходимой местности

Компания водоснабжения Mekorot / Beit Shemesh Water Company
Израиль

 | 

2017
Replacing Steel for PE-X Pipes to Transported Processed Water.

Replacement of Steel Pipes for PE-X

Rosebel Gold Mines – IamGold
Suriname

 | 

2020
Прокладка подземных труб для транспортировки воды по дороге рудника.

Транспортировка воды по дороге рудника

CODELCO — Рудник Андина
Чили

 | 

2019
Закачка цементной суспензии в шахту

Обратная засыпка

Шахта Aguilar
Аргентина

 | 

2015
Profertil and the Adaptation to New Chemical Processes with Pexgol.

Efficient Implementation of NaOH Drainage Systems

Pluspetrol
Argentina

 | 

2023
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023