Safety and durability: The heart of our solutions

Pexgol and Fresnillo: Allies in innovative piping solutions for mining.

Case Study Nº

153

Customer

Minera Fresnillo
Mexico

|

2021

Working Conditions

Pressure: 130 psi (pump pressure) | Temperature: Ambient 35°C / 95°F | Fluid: Slurry (tailings), concentration 55%

Pexgol Pipes

Pexgol 280 mm (12″), SDR 11

Application

Tailings transportation

Lenght

4800 m / 15748 ft

Categories

Safety and durability: The heart of our solutions

The Challenge

Fresnillo, a leader in silver and gold production in Mexico, faced significant issues with its existing HDPE pipeline in its mining unit. Frequent failures in mechanical joints, including detachments of stub ends, failures in thermal fusions and flanges, created a potential risk of tailings spills, raising concerns for safety and environmental impact.

Pexgol Solution

Pexgol addressed this challenge with its scientifically proven and abrasion-resistant PE-X pipes, being up to four times more resistant than HDPE.

The electrofusion joints in Pexgol pipes ensured double safety, significantly reducing the risk of leaks. The installation was remarkably efficient, with each 120-meter roll laid out in just 20 minutes, allowing for rapid progress without compromising safety or quality.

A crucial aspect of Pexgol’s service was the comprehensive training provided to Fresnillo mine staff. This training ensured that the personnel were skilled in handling and installing Pexgol pipes, particularly mastering the electrofusion process. This skill development initiative not only facilitated smoother installations but also empowered the mine team with the knowledge and confidence to maintain pipeline integrity, reflecting Pexgol’s commitment to excellence and collaboration in every project.

Related Case Studies

Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023
Pexgol Transforms Tailings Transportation at Minera San Julián.

Minera San Julián Adopts Pexgol to Improve Water Management

Fresnillo plc
Mexico

 | 

2024
Замена титановых труб на трубы Pexgol для транспортировки кислого раствора.

Обогатительный комбинат: транспортировка выщелоченной пульпы

Barrick Gold — Пуэбло Вьехо
Доминиканская Республика

 | 

2018
Монтаж труб Pexgol для вертикального дренажа

Вертикальный отвод вод

Полтавский ГОК, Ferrexpo
Украина

 | 

2019
Reduced wear and increased durability in the sand cleaning process at KSB de México.

Improving efficiency in steel foundry with Pexgol

KSB de Mexico
Mexico

 | 

2023
Enhanced hydraulic and structural reliability for critical community infrastructure.

Optimization of Potable Water Supply for 1,600 residents

Rincón de la Candelaria
Mexico

 | 

2025