Streamlining Effluent Treatment with Pexgol

Innovation and improvement in fluid transportation in the oil and gas industry.

Case Study Nº

126

Customer

Pan American Energy
Argentina

|

2023

Working Conditions

Temperature: 50°C / 122°F | Flow: 18 m³/h | Pressure: 6 Kg/cm2g | Density: 1007,2kg/m3 | Total dissolved solids: 180°C 1.750mg/l | Total Petroleum Hydrocarbons: <0,2mg/l | Total hardness: <10mg/l

Pexgol Pipes

Pexgol 180 mm (6″), Class 15

Application

Water Transport

Lenght

2322 m / 7618 ft

Categories

Innovation and improvement in fluid transportation in the oil and gas industry.

The Challenge

Pan American Energy LLC (PAE), an oil and gas exploration and production company with hydrocarbon reserves in Argentina, Bolivia, and Chile, faced a specific challenge at its waste management center in Argentina.

The goal was to pump the fluid, mostly water, generated in the gas scrubbers and stored in a sump tank to the effluent treatment plant. This fluid had specific characteristics, including a density of 1007.2 kg/m³, Total Dissolved Solids 180ºC of 1,750 mg/l, Total Petroleum Hydrocarbons <0.2 mg/l, and Total Hardness <10 mg/l. The fluid was transported at a temperature of 50°C, a flow rate of 18 m³/h, and a pressure of 6 kg/cm²g.

Pexgol Solution

The chosen solution to overcome this challenge was the 6” (180 mm, Class 15) Pexgol piping, known for its quick installation, lightness, ease of handling, and ability to be transported in long lengths and rolls.

The piping installation process was relatively fast, requiring only 8 days for complete assembly. The pipe was unrolled and fused through electrofusion, a process known for its efficiency. To facilitate the installation and ensure proper functioning, Pexgol provided electrofusion training services, guaranteeing the correct handling and installation of the material.

By opting for Pexgol piping, Pan American Energy was able to efficiently and safely transport the fluid from its sump tank to the effluent treatment plant, demonstrating the effectiveness and adaptability of Pexgol piping to different environments and challenges.

Related Case Studies

Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
The Robust & Flexible Answer to Constantly Changing Mine Surfaces.

Evolving Mine Operations with Pexgol Piping

Peña Colorada
Mexico

 | 

2023
Pexgol’s proposal was clear - to provide a pipe that showcased superior wear resistance, estimated to be three times more durable than HDPE.

Transforming Tailings Transport: The Pexgol Advantage

Lundin Mining
Chile

 | 

2021
Транспортировка подземных вод с низким уровнем pH

Транспортировка подземных вод

Компания Grupo México, шахта Buena Vista del Cobre
Мексика

 | 

2015
Replacement of Carbon Steel Pipes with Pexgol for the Transportation of Natural Gas.

Natural Gas Transportation with Pexgol

YPF
Argentina

 | 

2022
Прокладка подземных труб для транспортировки воды по дороге рудника.

Транспортировка воды по дороге рудника

CODELCO — Рудник Андина
Чили

 | 

2019