Skip to content

Switch to Pexgol Reduces Downtime in Molybdenum Concentrate Transport

Pexgol’s resistance to scaling and chemicals delivers consistent operation in open-pit mining.

Case Study Nº

176

Customer

Buena Vista del Cobre
Mexico

|

2024

Working Conditions

Temperature: Ambient (Design temp. 40°C) | Pressure: 160–180 psi | Flow Rate: 335 m³/hr | Fluid Composition: Molybdenite (MoS₂) in copper-molybdenum concentrate, with Mo, Cu, Fe, S, and Si

Pexgol Pipes

Pexgol 8″ SDR 11

Application

Molybdenum concentrate flotation

Lenght

100 m / 328 ft

Categories

Switch to Pexgol Reduces Downtime in Molybdenum Concentrate Transport

The Challenge

At the Buena Vista del Cobre open-pit mine in Sonora, Mexico, molybdenum concentrate was transported through an HDPE pipeline. This system was regularly compromised by the highly scaling nature of the fluid, which consisted primarily of molybdenite (MoS₂) in a copper-molybdenum concentrate containing Mo, Cu, Fe, S, and Si.

The HDPE pipelines required daily manual intervention to prevent blockages, including frequent hammering along the line to maintain flow. Additionally, sections of the pipe had to be replaced at least once a month due to severe scaling buildup—resulting in high maintenance costs, operational delays, and recurring shutdowns.

The Solution

In 2024, the mine replaced 100 meters of 8” SDR 11 HDPE pipe with Pexgol pipe for its molybdenum concentrate flotation line. Pexgol was selected for its exceptional chemical and corrosion resistance, and especially its superior performance against scaling—a crucial feature given the aggressive nature of the transported slurry and the system’s operating conditions (160–180 psi pressure and temperatures up to 40°C).

The installation was fast and simple, requiring no specialized equipment. The Pexgol coil was unrolled using an excavator and front loader, and the pipe was laid in place within hours. Only electrofusion couplings (EF) were used, further simplifying the process.

Results

After one year of continuous operation, the client reported zero blockages and no maintenance required on the Pexgol line. This has eliminated the need for frequent replacements and cleaning, drastically reducing operational costs and ensuring uninterrupted flotation processes that meet Grupo México’s high efficiency standards.

Related Case Studies

Транспортировка воды под высоким давлением для золотого рудника.

Транспортировка воды под высоким давлением

Рудник Mansfield
Аргентина

 | 

2019
Transportation of brackish water to the main pumping station

Водопроводные линии — суровые природные условия

Работы на Мертвом море
Израиль

 | 

1993
Транспортировка грязной воды (жидкие отходы производства пальмового масла) с высоким содержанием органических веществ.

Транспортировка грязной воды на заводе по переработке пальмового масла

La Gloria
Колумбия

 | 

2020
Транспортирование смешанной жидкости и коррозионных паров (H2S) из осушительных установок

Переработка минерального сырья. Коррозионные жидкости и пар

Компания Moa Nickel S.A. Sherritt
Куба

 | 

2011
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023